Pomiń treść
Powrót do wyszukiwania

North Macedonia – Pipeline-inspection services – Inspection of the natural gas transmission system Zhidilovo–Skopje and distribution pipeline Skopje South using the in-line method, and inspection of Deve Bair–Zhidilovo (0–4 km) and distribution pipelines Skopje North 1.8 km, Bunardzhik 5.4 km, Kumanovo 7.7 km, Kratovo 4.6 km and Kriva Palanka 1.5 km using NDT methods

Joint Stock Company for performing energy activity natural gas transmission NOMAGAS Skopje in state ownershipMacedonia PółnocnaOpublikowano 25 paź 2026
27 dni pozostało

Opis

Services for inspection of the natural gas transmission system Zhidilovo–Skopje and the distribution pipeline Skopje South using in-line inspection (ILI), as well as inspection of the Deve Bair–Zhidilovo section (0–4 km) and the distribution pipelines Skopje North (1.8 km), Bunardzhik (5.4 km), Kumanovo (7.7 km), Kratovo (4.6 km) and Kriva Palanka (1.5 km) using non-destructive testing (NDT) methods, in accordance with the technical specification in the tender documentation.

Kody CPV

Pipeline-inspection services

Dokumenty i przesyłka

Podsumowanie AI
Zaloguj się, aby uzyskać podsumowanie AI

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Powiązane zamówienia