Powrót do wyszukiwania
Ta oferta została wycofana.
Malta – Budowa portów – IMT008/2025 - Tender for the Construction of a New Cargo Facility at Ras Hanzir between Laboratory and Fuel Wharves, Corradino, Grand Harbour, Malta.
Infrastructure MaltaMaltaOpublikowano 23 wrz 2026
Termin minąłOpis
IMT008/2025 - Ogłoszenie przetargu na budowę nowego magazynu towarowego w Ras Hanzir pomiędzy Laboratorium i Nabrzeżem Paliwa, Corradino, Grand Harbour, Malta.
Kody CPV
Harbour construction worksQuay construction workQuay wall construction workMarine construction worksWharf construction workElectricity supply installationsEngineering works and construction worksStorm-water piping construction workInfill and land-reclamation workInstallation of port lighting equipmentReinforced-concrete workPilingSheet piling
Dokumenty i przesyłka
Podsumowanie AI
Zaloguj się, aby uzyskać podsumowanie AIContains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Powiązane zamówienia
Malta – Construction works for sewage treatment plants, purification plants and refuse incineration plants – WSC/T/092/2026 - WORKS - DESIGN, BUILD, TEST AND COMMISSION AN UPGRADE OF THE GOZO WASTEWATER TREATMENT PLANT USING ENVIRONMENTALLY FRIENDLY MEASURES AND FIDIC CONDITIONS FOR THE WATER SERVICES CORPORATION
Water Services CorporationMaltaConstruction works for sewage treatment plants, purification plants and refuse incineration plantsWaste-treatment plant construction workWastewater treatment plant construction workTermin za 100 dniOpublikowano 15 lis 2026
Malta – Trench-digging work – TD/T/0000/PC3/2026 _IN THE PROCESS OF BEING CANCELLED (TECHNICAL ISSUE)
Enemalta plcMaltaTrench-digging workInstallation of cable layingTermin za 1061 dniOpublikowano 11 lis 2026
Malta – Overhaul and refurbishment work – SPD8/2026/135 TENDER FOR THE RESTORATION OF A HISTORIC COASTAL ARTILLERY SEARCHLIGHT POST TO HIGH ENERGY EFFICIENCY STANDARDS USING ENVIRONMENTALLY FRIENDLY MATERIALS AND PRODUCTS AT THE INWADAR PARK.
Sectoral Procurement DirectorateMaltaOverhaul and refurbishment workRestoration workStructural worksTermin za 16 dniOpublikowano 04 lis 2026
Malta – Trench-digging work – TD/T/3982/2026 (17314) TRENCHING WORKS AND LAYING OF 33KV CABLES BETWEEN 132KV DC AND XEWKIJA DC, QALA DC AND NEW KERCEM AREA DC IN AN ENVIRONMENTALLY FRIENDLY MANNER
Enemalta plcMaltaTrench-digging workExcavating workInstallation of cable layingTermin za 21 dniOpublikowano 04 lis 2026