Powrót do wyszukiwania
Ten przetarg wygasł.
North Macedonia – Construction work – Construction of the Interconnected Gas Pipeline Macedonia-Serbia (FIDIC Contract - turnkey)
Joint Stock Company for performing energy activity natural gas transmission NOMAGAS Skopje in state ownershipMacedonia PółnocnaOpublikowano 02 cze 2026
Termin minąłOpis
Construction of the Interconnected Gas Pipeline Macedonia-Serbia (FIDIC Contract - turnkey)
Kody CPV
Construction work
Dokumenty i przesyłka
Podsumowanie AI
Zaloguj się, aby uzyskać podsumowanie AIContains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Powiązane zamówienia
North Macedonia – Construction work – Construction of Facilities in the Central Service Unit, Pretrial Unit and Closed Unit and Infrastructure at Idrizovo Correctional Facility (Segment II Stage 1)
Ministry of Justice – Directorate for Execution of SanctionsMacedonia PółnocnaConstruction workTermin za 2 dniOpublikowano 11 lis 2026
North Macedonia – Railway construction works – Construction of New Railway Section from Kriva Palanka to the Border of the Republic of Bulgaria, as part of Corridor VIII
Public Enterprise for Railway Infrastructure Railways of the Republic of North Macedonia – Skopje (ZRSMI)Macedonia PółnocnaRailway construction worksTermin za 60 dniOpublikowano 23 wrz 2026
Polska – Roboty budowlane w zakresie gazociągów – Przebudowa gazociągu DN400 MOP 4,22MPa Sędziszów – Tarnów Mościce wraz z odgałęzieniami do stacji gazowych
Operator Gazociągów Przesyłowych GAZ-SYSTEM S.A.PolskaConstruction work for gas pipelinesTermin za 44 dniOpublikowano 19 lis 2026
Sverige – Anläggningsarbete – Upphandling av entreprenadmaskiner inkl förare
RAMBO ABSzwecjaConstruction workHire of construction and civil engineering machinery and equipment with operatorHire of trucks with driverTermin za 31 dniOpublikowano 19 lis 2026