Pomiń treść
Powrót do wyszukiwania

Norway – Calculation of costs, monitoring of costs – Framework agreement for cost calculations and uncertainty analysis.

Oslo kommune v/ Eiendoms- og byfornyelsesetatenNorwegiaOpublikowano 26 paź 2026
20 dni pozostało

Opis

The aim of the framework agreement is to cover the agency's ongoing need for external assistance regarding calculation of costs with uncertainty analyses, connected to the development of public infrastructure. There will mainly be grey-blue-green measures, such as streets, pedestrian and footpaths, footpaths, squares, parks and footbridges, streams and surface water systems that shall be cost calculated. However, there can also be cases where the infrastructure measures below the ground are cost calculated, such as other water and sewage systems and measures such as moving power lines. Some other types of cost calculation assignments can occur.

Kody CPV

Calculation of costs, monitoring of costsEngineering design servicesProject and design preparation, estimation of costsInfrastructure works consultancy services

Dokumenty i przesyłka

Podsumowanie AI
Zaloguj się, aby uzyskać podsumowanie AI

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Powiązane zamówienia