Powrót do wyszukiwania
Malta – Roboty budowlane w zakresie podstacji – CT3065/2026 - Works - Tender for the Design, Supply, Installation, Testing, and Commissioning of a 245kV, 120MVAr Shunt Reactor, 245KV GIS, and Associated Systems at Maghtab including Civil Works in an Environmentally Friendly Manner
Department of ContractsMaltaOpublikowano 18 lis 2026
46 dni pozostałoOpis
CT3065/2026 - Prace - Zaproszenie na przetarg na projektowanie, dostawę, montaż, testowanie i uruchomienie 245kV, 120MVAr reaktora szuntowego, 245kV GIS i powiązanych systemów w Maghtab, w tym prace budowlane w sposób przyjazny dla środowiska
Kody CPV
Substation construction workHigh voltage installation workLow-voltage installation workExcavating work
Dokumenty i przesyłka
Podsumowanie AI
Zaloguj się, aby uzyskać podsumowanie AIContains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Powiązane zamówienia
Malta – Footpath construction work – Maintenance and Construction of Resource-Efficient Pavements, Boundary Walls and Other Ancillary Works for the Marsaskala Local Council
Marsaskala Local CouncilMaltaFootpath construction workFoundation work for footpathsSurface work for footpathsTermin za 30 dniOpublikowano 19 lis 2026
Malta – Workshops construction work – CT2382/2026 - DESIGN AND BUILD OF A WORKSHOP OVER AN EXISTING UNDERGROUND WATER RESERVOIR
Department of ContractsMaltaWorkshops construction workConstruction work for warehouses and industrial buildingsConstruction work for industrial buildingsTermin za 47 dniOpublikowano 18 lis 2026
Malta – Construction works for sewage treatment plants, purification plants and refuse incineration plants – WSC/T/092/2026 - WORKS - DESIGN, BUILD, TEST AND COMMISSION AN UPGRADE OF THE GOZO WASTEWATER TREATMENT PLANT USING ENVIRONMENTALLY FRIENDLY MEASURES AND FIDIC CONDITIONS FOR THE WATER SERVICES CORPORATION
Water Services CorporationMaltaConstruction works for sewage treatment plants, purification plants and refuse incineration plantsWaste-treatment plant construction workWastewater treatment plant construction workTermin za 97 dniOpublikowano 15 lis 2026
Malta – Trench-digging work – TD/T/0000/PC3/2026 _IN THE PROCESS OF BEING CANCELLED (TECHNICAL ISSUE)
Enemalta plcMaltaTrench-digging workInstallation of cable layingTermin za 1058 dniOpublikowano 11 lis 2026