Pular para o conteúdo
Voltar para a pesquisa
Esta licitação expirou.

Norvégia – Villamos szerelési munka – Electro contract at Frier Vest harbour terminal.

Norconsult Norge ASNoruegaPublicado em 12 de abr. de 2026
Prazo expirado

Descrição

The electro contract will be executed as a turnkey contract in accordance with NS 8407, based on the attached function description. When the contract is signed, the contract is planned to be transported to the turnkey contractor for the 'Development terminal area - phase 1'. Turnkey contractor phase 1 is establishing ditches, conduits/cable routes and other infrastructure in the ground, delivers technical house and assembles light masts (interface with electro). The electrical contractor designs and specifies requirements for this infrastructure, verifies that the systems are suitable and signals of defects/deviations. The electrical contractor delivers complete electrical installations in accordance with the function description, including cabling, termination, assembly, testing and commissioning, as well as installations in the engineering centre and connections with light masts. Constructional deliveries, foundations, conduits in the ground and mechanical mast assembly are not included. Participation in co-ordination/interface meetings and coordination with the turnkey contractor, other contracts, builder and network owner shall be expected. Necessary adaptations of conveying roads for a complete and regulatory facility are included. The engineering design services will start after the contract has been awarded; the installation work is planned for September 2026.

Códigos CPV

Electrical installation workElectrical engineering installation works

Documentos e envio

Resumo da IA
Faça login para um resumo da IA

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Concursos relacionados