Pular para o conteúdo
Voltar para a pesquisa

Norway – Calculation of costs, monitoring of costs – Framework agreement for cost calculations and uncertainty analysis.

Oslo kommune v/ Eiendoms- og byfornyelsesetatenNoruegaPublicado em 26 de out. de 2026
18 dias restantes

Descrição

The aim of the framework agreement is to cover the agency's ongoing need for external assistance regarding calculation of costs with uncertainty analyses, connected to the development of public infrastructure. There will mainly be grey-blue-green measures, such as streets, pedestrian and footpaths, footpaths, squares, parks and footbridges, streams and surface water systems that shall be cost calculated. However, there can also be cases where the infrastructure measures below the ground are cost calculated, such as other water and sewage systems and measures such as moving power lines. Some other types of cost calculation assignments can occur.

Códigos CPV

Calculation of costs, monitoring of costsEngineering design servicesProject and design preparation, estimation of costsInfrastructure works consultancy services

Documentos e envio

Resumo da IA
Faça login para um resumo da IA

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Concursos relacionados