Pular para o conteúdo
Voltar para a pesquisa

Norvégia – Távfűtés – Temporary warming Botsen

STATSBYGGNoruegaPublicado em 07 de set. de 2026
34 dias restantes

Descrição

Statsbygg requests tenders for temporary heating of Botsen.The aim is to establish a reliable and comprehensive system for heat production based on pellets, where the tenderer is responsible for the total responsibility for the energy delivery. Buildings and energy need Property: BotsenHeated building area: approx. 17,000 m² Estimated annual energy consumption: approx. 450,000 kWh Estimated highest energy need per month: approx. 90,000 kWhEseen the highest energy need per hour: 150 kWTur temperature at the connection point must be delivered at minimum 55 degrees for an effect need of 150 kW.The energy shall only be used for heating. The building is currently heated by district heating, which it receives from the existing prison, which is still active. This system will be disconnected from 15.02.27.

Códigos CPV

District heatingWood fuels

Documentos e envio

Resumo da IA
Faça login para um resumo da IA

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Concursos relacionados