Norway – Electrical installation work – Electro contract at Frier Vest harbour terminal.
Descriere
The electro contract will be executed as a turnkey contract in accordance with NS 8407, based on the attached function description. When the contract is signed, the contract is planned to be transported to the turnkey contractor for the 'Development terminal area - phase 1'. Turnkey contractor phase 1 is establishing ditches, conduits/cable routes and other infrastructure in the ground, delivers technical house and assembles light masts (interface with electro). The electrical contractor designs and specifies requirements for this infrastructure, verifies that the systems are suitable and signals of defects/deviations. The electrical contractor delivers complete electrical installations in accordance with the function description, including cabling, termination, assembly, testing and commissioning, as well as installations in the engineering centre and connections with light masts. Constructional deliveries, foundations, conduits in the ground and mechanical mast assembly are not included. Participation in co-ordination/interface meetings and coordination with the turnkey contractor, other contracts, builder and network owner shall be expected. Necessary adaptations of conveying roads for a complete and regulatory facility are included. The engineering design services will start after the contract has been awarded; the installation work is planned for September 2026.
Coduri CPV
Documente și transmitere
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Achiziții similare
Norway – Construction work – Operation and improvement of national road 13 Skare-Voss 2027-2032
Nye Veier ASNorvegiaConstruction workEngineering works and construction worksConstruction work for bridges and tunnels, shafts and subwaysFără termen limităPublicat pe 21 oct. 2026
Norway – Road-surface painting work – Longitudinal road markings Innlandet 2027-2030
Innlandet fylkeskommuneNorvegiaRoad-surface painting workRoad markingsConstruction workTermen limită în 31 zilePublicat pe 21 oct. 2026
Norway – Road-surface painting work – Transverse road markings Innlandet 2027-2030
Innlandet fylkeskommuneNorvegiaRoad-surface painting workSurface work for roadsSurface work for highwaysTermen limită în 31 zilePublicat pe 21 oct. 2026
Norway – Lift installation work – Replacement of lifts - Martina Hansens Hospital
SYKEHUSINNKJØP HFNorvegiaLift installation workLift-maintenance servicesLiftsTermen limită în 29 zilePublicat pe 20 oct. 2026