Polonia – Lucrări de construcţii de complexe sportive – Przebudowa stadionu lekkoatletycznego przy ul. Sulechowskiej w Zielonej Górze
Descriere
1. Contracting authority informs that the investment referred to in point 3.1. SWZ will be carried out in the design and build formula, therefore the scope of the subject of the contract includes: 1) preparation of the design documentation together with pre-design works, obtaining the required decisions, agreements, opinions and permits; 2) organization of the construction site, execution of all services and supplies, execution of construction works based on the prepared design documentation together with obtaining the required decisions, agreements, opinions, permits for execution and acceptance of the works, as well as the transfer of the facility for use in accordance with its intended purpose, the requirements of the Contracting Authority, the Contract and the applicable regulations. 2. The athletics stadium will be a facility that meets the requirements set by PZLA for Category III facilities. After the completion of the investment objective, the facility will have a PZLA Certificate (currently the facility does not have a PZLA Certificate). The football field with a natural surface located inside the Stadium (Main Arena) will meet the requirements of PZPN for II league clubs with the elements required by the regulations of PZPN for I league clubs indicated in the current PFU; the facility will have a PZPN license for the II league (currently the facility has a license to play matches in the III league). It is assumed that the infrastructure elements of the football field indicated in the PFU will be able to be adapted (in an independent investment task) to the requirements specified by the PZPN regulations for I league clubs. It will be the obligation of the Contractor to meet all the requirements that will allow the Contracting Authority to make such an adaptation, without the need for subsequent demolitions, dismantling or rebuilding of the stadium building facilities - this scope will be subject to special verification by the Contracting Authority. 3. A detailed description of the subject of the contract is contained in Annex No. I.2 to the SWZ and in the documents referred to in point 3.5. SWZ. 4. The subject of the contract should be executed in accordance with the Functional-User Program (PFU) together with the annexes contained in Annex No. I.5 to the SWZ. 5. The Contracting Authority informs that for this task, funding has been granted by the Ministry of Sport and Tourism within the framework of the Program of investments of particular importance for sport – edition 2025. Due to technical limitations, the remaining part of the information is in the tender documents (SWZ).
Coduri CPV
Documente și transmitere
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Achiziții similare
Polska – Instalacje osadu – Budowa instalacji grawimetrycznej selekcji osadu czynnego i układu sterowania napowietrzaniem na Oczyszczalni Ścieków w Rzeszowie
Miejskie Przedsiębiorstwo Wodociągów i Kanalizacji Sp. z o.o.PoloniaSedimentation installationsSite preparation and clearance workAssembly of metal structuresTermen limită în 21 zilePublicat pe 01 nov. 2026
Polska – Roboty budowlane – Remont łazienek na parterze, tarasu oraz wskazanych pomieszczeń w Szpitalu Dziecięcym „Stokrotka” należącym do Uzdrowiska Goczałkowice - Zdrój Sp. z o.o. w Goczałkowicach - Zdroju
Uzdrowisko Goczałkowice-ZdrójPoloniaConstruction workPlumbing and sanitary worksHeating, ventilation and air-conditioning installation workTermen limită în 27 zilePublicat pe 01 nov. 2026
Polska – Roboty drogowe – Zabezpieczenie osuwiska wraz z odbudową DW 993 w m. Bednarka
Zarząd Dróg Wojewódzkich w KrakowiePoloniaRoadworksEngineering works and construction worksDemolition, site preparation and clearance workTermen limită în 28 zilePublicat pe 01 nov. 2026
Polska – Roboty budowlane w zakresie ścieżek rowerowych – Rozbudowa dróg powiatowych w ramach projektu „Rowerowe Roztocze. Drogi pieszo-rowerowe w obszarach wiejskich” na terenie powiatu biłgorajskiego
Powiat BiłgorajskiPoloniaCycle path construction workFootpath construction workSite preparation workTermen limită în 6 zilePublicat pe 01 nov. 2026