Sări la conținut
Înapoi la căutare
Acest licitație a fost retrasă.

Polonia – Lucrări de construcţii de complexe sportive – Przebudowa stadionu lekkoatletycznego przy ul. Sulechowskiej w Zielonej Górze

Miasto Zielona Góra - Miejski Ośrodek Sportu i RekreacjiPoloniaPublicat pe 01 oct. 2026
Deadline trecut

Descriere

1. Contracting Authority informs that the investment referred to in point 3.1. SWZ will be carried out in the design and build formula, which is why the subject of the contract includes: 1) preparation of the design documentation along with pre-design works, obtaining the required decisions, agreements, opinions and permits; 2) organisation of the construction site, execution of all services and supplies, execution of construction works based on the prepared design documentation along with obtaining the required decisions, agreements, opinions, permits for the execution and acceptance of Works and handover of the object for use in accordance with its intended purpose, the requirements of the Contracting Authority, the Contract and the applicable regulations. 2. The athletics stadium will be an object that meets the requirements set by PZLA for Category III facilities. After the implementation of the Investment Intention, the object will have a PZLA Certificate (currently the object does not have a PZLA Certificate). The football pitch with a natural surface located inside the Stadium (Main Arena) will meet the requirements of PZPN for II league clubs with the elements required by the regulations of PZPN for I league clubs indicated in the current PFU; the object will have a PZPN license for II league (currently the object has a license to play matches in III league). It has been assumed that the infrastructure elements of the Football Pitch indicated in the PFU will be able to be adapted (in an independent investment task) to the requirements specified by the PZPN Regulations for I league clubs. It will be the responsibility of the Contractor to meet all the requirements that will allow the Contracting Authority to make such an adaptation, without the need for later demolition, dismantling or reconstruction of the building objects of the Stadium - this scope will be subject to special verification by the Contracting Authority. 3. A detailed description of the subject of the contract is contained in annex no. I.2 to the SWZ and in the documents referred to in point 3.5. of the SWZ. 4. The subject of the contract should be executed in accordance with the Functional-Use Program (PFU) together with the annexes contained in annex no. I.5 to the SWZ. 5. The Contracting Authority informs that for this task, co-financing has been granted by the Ministry of Sport and Tourism within the Program of investments of particular importance for sport - edition 2025. Due to technical limitations, the remaining part of the information is in the tender documents (SWZ).

Coduri CPV

Construction work for sports facilitiesArchitectural, construction, engineering and inspection servicesSite-development workDemolition workConstruction workBuilding construction workBuilding installation workElectrical installation workPlumbing and sanitary worksHeating, ventilation and air-conditioning installation workBuilding completion workEngineering servicesLandscape architectural services

Documente și transmitere

Rezumat AI
Conectează-te pentru un rezumat AI

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Achiziții similare