Horvátország – Víz- és szennyvízvezetékek építése – Improvement of water and wastewater infrastructure in the Gorski Kotar Region, Croatia
Descriere
LOT 1 - Rehabilitation of water supply pipelines in part of the settlement of Lokve – DIP settlement and construction of public sewer system of the settlement of Lokve – PART 1. The project includes the construction of sanitary sewers in part of the Lokve agglomeration (DIP settlement) in the length of 246.50 m', rehabilitation of part of the water supply system of Lokve (DIP settlement) in the length of 383.77 m', inspection of state, development of implementation designs, as-built surveys, reports on as-built state and supporting documents necessary for works performance and obtaining Use Permits; LOT 2 - Construction of the water supply system and public sewer system in the municipality of Ravna Gora (Cagar) and rehabilitation of a section of water pressure pipeline PS Šije – WT Kosa. The project includes the construction of the water supply pipeline in the length of 835.00 m' and construction of the public sewer system in the length of 722.18 m' in the settlement of Cagar, and rehabilitation of the water pressure pipeline PS Šije – WT Kosa in the length of 387.78 m', with the development of implementation designs, as-built survey, report on as-built state and supporting documents necessary for works performance and obtaining Use Permits; LOT 3 - Rehabilitation of transmission pipeline WT Sv. Ilija – WT Nadvučnik. The project includes the construction of a bypass, the replacement of 7,449 m, and the development of implementation designs, as-built surveys, reports on as-built state and supporting documents necessary for works performance and obtaining Use Permits.
Coduri CPV
Documente și transmitere
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Achiziții similare
Horvátország – Szerkezetátalakítás – Izvođenje radova na rekonstrukciji i dogradnji Konjičkog centra
OPĆINA BARBANCroațiaRestructuring workConstruction workConstruction work for buildings relating to leisure, sports, culture, lodging and restaurantsTermen limită în 6 zilePublicat pe 22 iul. 2026
Horvátország – Helyreállítás – IZVOĐENJE RADOVA ENERGETSKE OBNOVE DOMA ZDRAVLJA CENTAR, AVENIJA VEĆESLAVA HOLJEVCA 22, PROJEKT ZA-GREEN
GRAD ZAGREBCroațiaRestoration workTermen limită în 28 zilePublicat pe 22 iul. 2026
Horvátország – Elemi iskola építése – Rekonstrukcija i dogradnja Osnovne škole Novalja
LIČKO-SENJSKA ŽUPANIJACroațiaPrimary school construction workSite preparation workWaterproofing workTermen limită în 22 zilePublicat pe 22 iul. 2026
Horvátország – Építési munkák – Radovi izgradnje Inovacijskog centra u sklopu Tehnološkog parka Varaždin „Innocent“
Tehnološki park Varaždin d.o.o.CroațiaConstruction workTermen limită în 35 zilePublicat pe 22 iul. 2026