Înapoi la căutare
Această licitație a expirat.
Ireland – Construction work – Provision of design deliver and installation of floodlighting system for the National Cricket Centre
Sport IrelandIrlandaPublicat pe 10 mai 2026
Deadline trecutDescriere
A floodlighting specialist is required to develop the design and then deliver a fully engineered solution covering the design, procurement, manufacture, installation, testing and commissioning of the floodlights, masts/headframes, electrical infrastructure and a DMX‑based lighting control system for the National Cricket Centre. The floodlighting system is required to meet national and international standards for both TV broadcast and non‑TV use.
Coduri CPV
Construction work
Documente și transmitere
Rezumat AI
Conectează-te pentru un rezumat AIContains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Achiziții similare
Ireland – Construction work – Request for Expressions of Interest for Purpose-Built Student Accommodation ("PBSA") - Potential On-Campus and Off-Campus Development Opportunities
National Development Finance AgencyIrlandaConstruction workRepair and maintenance servicesRepair and maintenance services of building installationsTermen limită în 24 zilePublicat pe 02 nov. 2026
Ireland – Construction work – Tender No 21 Main Contractor and PSCS Services for Upgrade / Alteration Works at Osprey House
The Irish Air Navigation ServiceIrlandaConstruction workBuilding alteration workWorks for complete or part construction and civil engineering workTermen limită în 29 zilePublicat pe 02 nov. 2026
Ireland – Building construction work – Design and build Dublin Air Traffic Control Centre (ATCC) contingency room
The Irish Air Navigation ServiceIrlandaBuilding construction workWorks for complete or part construction and civil engineering workElectrical installation workTermen limită în 36 zilePublicat pe 02 nov. 2026
Ireland – General construction work for pipelines – New 1860 meters length of 200mm PE100, SDR11 Rising watermain in New Inn Village for New Inn gws plus work on existing 63mm PE80, SDR 11 watermain approx. 2.0km from New Inn Village
New Inn Group Water Scheme 2IrlandaGeneral construction work for pipelinesConstruction work for water and sewage pipelinesPipelaying construction workTermen limită în 15 zilePublicat pe 01 nov. 2026