Írsko – Stavebné práce – Cunningham House Redevelopment at Trinity Hall, Dartry, Dublin 6
Popis
Redevelopment of Cunningham House will consist of an extension to existing purpose-built student accommodation at Trinity Hall with an overall gross floor area of approximately 10,982 sqm providing a total of 358 purpose-built student bed spaces together with complementary and ancillary uses. The project works will comprise of the demolition of Cunningham House, the Sports Hall (including existing part basement), the eastern section of the historic rear boundary wall and associated single storey ancillary sheds and the provision of 4 new connected blocks arranged in a quadrangle form: Block A ranges in height from four to eight storeys; Block B is four storeys in height; Block C is three storeys in height while the Forum Block is single storey in height (partially double height space). The project scope will include: • 358 purpose-built student bed spaces • 4 staff apartments • 2 study spaces/classrooms • A replacement multi-use Sports Hall, together with the adjoining Forum amenity space • Outdoor amenity spaces within the central courtyard together with enhanced public realm and landscaping works • 188 bicycle parking spaces within the application site • Single storey security hut at the main vehicular entrance • Works to Oldham House (a Protected Structure) to include works necessary for the demolition and replacement of late 20th century Sports Hall (directly abutting Oldham House). • Provision of a screen wall to the south of Greenane House (a Protected Structure). • All associated and ancillary landscaping works; site lighting; refuse storage; boundary treatments; plant; solar photovoltaic panels; water, wastewater and surface water works; upgrade works to existing electrical substation and all other site and development works.
Kódy CPV
Dokumenty a odovzdanie
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Súvisiace zákazky
Írország – Építési munkák – Contractor for Heating System Upgrade and Gas Conversion Emergency Works Project at St. Joseph’s Community College, Kilkee, Co. Clare
Limerick and Clare Education and Training BoardÍrskoConstruction workHeating worksSecondary school construction workDeadline za 11 dniPublikované 13. 9. 2026
Írország – Tetőfedés – GRETB- Upgrade Works to Building 1 + Building 2 GRETB Training Centre, Mervue Business Park, Mervue, Galway for Galway + Roscommon ETB
Galway Roscommon Education and Training Board_92189ÍrskoRoof-covering workRoof maintenance workRoof repair and maintenance workDeadline za 32 dniPublikované 13. 9. 2026
Írország – Gépészeti szerelések – CFT for the installation of a new free cooling Chiller and associated mechanical and electrical works to the existing Netlabs building at SETU Waterford
South East Technological University (SETU)ÍrskoMechanical installationsDeadline za 28 dniPublikované 13. 9. 2026
Írország – Gépészeti szerelések – CFT for the supply and installation of Gas Manifolds and Regulators to SETU Waterford campus
South East Technological University (SETU)ÍrskoMechanical installationsDeadline za 28 dniPublikované 13. 9. 2026