Nemecko – Inštalovanie eskalátorov (pohyblivých schodov) – Rahmenvertrag Fahrtreppen
Popis
Escalators, including their manufacture, delivery, installation, commissioning, and construction supervision, as well as the possible dismantling of old installations (contract duration 4 years, with the option of termination by the contracting authority after two or three years), divided into two regional lots: Lot 1 North and Lot 2 South. Lot 1 North includes the Northern, Western, and Eastern regions. Lot 2 South includes the Central, Southwest, Southern, and Southeast regions. The framework contract prices are fixed. In particular, the following requirements must be taken into account: • Impairments due to the use of grit, sand, salts and cleaning water • Increased corrosion stress • Heavy soiling by brake dust (rail traffic) • Penetration of body fluids (e.g. urine, especially in a reversing station) • Strong sunlight (e.g. UV light) • Extreme weather conditions (storm, hail, lightning strikes, etc.) • High traffic volume • High duty cycle • Vandalism resistance
Kódy CPV
Dokumenty a odovzdanie
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Súvisiace zákazky
Deutschland – Gleisbauarbeiten – GE Fahrsignalanlage Ruhbank
Stuttgarter Straßenbahnen AGNemeckoTrack construction worksDeadline za 29 dniPublikované 19. 11. 2026
Deutschland – Landschaftsgärtnerische Bauleistungen für Grünanlagen – Samtgemeinde Lüchow (Wendland) - Neubau Grundschule in Wustrow_Los 21 Freianlagen
Samtgemeinde Lüchow (Wendland)NemeckoLandscaping work for green areasDeadline za 52 dniPublikované 19. 11. 2026
Deutschland – Bauarbeiten – Fenster und Türen_rerl
Münchner Wohnen GmbHNemeckoConstruction workInstallation of doors and windowsDeadline za 29 dniPublikované 19. 11. 2026
Deutschland – Elektrotechnikinstallation – LWL - Förderschulzentrum, Bielefeld (Senne I); Ersatzneubau Opticusschule + Albratros; Baustrom; 26-269 E
LWL - Bau- und Liegenschaftsbetrieb (LWL-BLB)NemeckoElectrical engineering installation worksOther electrical installation workDeadline za 51 dniPublikované 19. 11. 2026