Írország – Repülőterek, futópályák és manőverezési felület építése – Apron Safety Reconfiguration Project
Popis
The scope of works comprises the reconfiguration of three nose-in aircraft stands adjacent to the terminal building to improve apron safety, operational efficiency and passenger routing. The Works are anticipated to include, but are not limited to, the following elements: • Apron Reconfiguration and Geometry Reconfiguration of existing stand layout to provide three fully independent Code C stands, eliminating operational constraints associated with the existing arrangement and improving aircraft manoeuvrability. • Pavement and Civil Engineering Works Construction of new rigid pavement for aircraft stands, flexible pavement works for taxi lane and fillets, and localised rehabilitation and overlay works to existing apron areas. • Drainage and De-icing Infrastructure Provision of drainage infrastructure, including dedicated de-icing areas with appropriate collection and treatment systems. • Airfield Systems and Ancillary Infrastructure Integration of airfield ground lighting (AGL), markings, and associated electrical and ducting infrastructure required to support the revised apron layout. • Passenger Interface Improvements Provision of covered walkways and associated infrastructure to enhance passenger safety and segregation from aircraft and ground operations. The Works will be delivered within a live operational airport environment and will require careful planning, phasing and coordination to maintain ongoing operations, including aircraft movements, passenger flows and ground service activities. The Works will also be subject to airport security requirements, including Garda vetting, BSAT training, security clearance processes and compliance with all applicable airport access permit requirements. Please refer to the tender documents for more details
Kódy CPV
Dokumenty a odovzdanie
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Súvisiace zákazky
Írország – Egycélú sportlétesítmények építése – Phase 2 Construction of New Clubhouse and Dressing Rooms - Internal Finishes
Killala GAAÍrskoSingle-purpose sports facilities construction workConstruction workDeadline za 27 dniPublikované 17. 8. 2026
Írország – Tetőjavítás – “Request for Tender for Roof Repairs at An Grianán Adult Education College, Termonfeckin, Co. Louth”
The Countrywomens TrustÍrskoRoof repairRoof works and other special trade construction worksErection and related works of roof frames and coveringsDeadline za 28 dniPublikované 17. 8. 2026
Írország – Építési munkák – Finglas Primary Care Centre
Health Service Executive (HSE)ÍrskoConstruction workTermín nebol udanýPublikované 17. 8. 2026
Írország – Hulladékkezelő mű építése – St. Cuan's College
St. Cuans CollegeÍrskoWaste-treatment plant construction workSewage treatment worksWastewater treatment plant construction workDeadline za 31 dniPublikované 17. 8. 2026