Finland – Laboratory, optical and precision equipments (excl. glasses) – Circulating Fluidised Bed (CFB) reactor and Heat Recovery Steam Generator (HRSG) pilot plant
Popis
Detailed engineering, manufacturing, delivery, installation, testing and commissioning of a 100 kWth circulating fluidized bed (CFB) pilot plant and an attached heat recovery steam generator (HRSG). The CFB shall be capable of combustion, gasification and other reaction modes using different feedstocks and the process gases specified in the technical documentation. The HRSG, located downstream of the CFB, shall operate as a once-through unit for steam generation and hot-gas cooling. The HRSG shall be designed and manufactured in accordance with PED 2014/68/EU using Module G conformity assessment. Detailed technical requirements, operating conditions, preliminary designs and CAD models are provided in the technical annexes of the Call for Tender. The selected tenderer may display its company name on the delivered CFB and HRSG test rigs.
Kódy CPV
Dokumenty a odovzdanie
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Súvisiace zákazky
Suomi – Energiamittarit – Kaukolämpömittarit
Vantaan Energia OyFínskoEnergy metersWater metersTermín nebol udanýPublikované 18. 10. 2026
Finland – Laboratory, optical and precision equipments (excl. glasses) – Cryogenic probe station and measurement system
Aalto University Foundation srFínskoLaboratory, optical and precision equipments (excl. glasses)Deadline za 28 dniPublikované 15. 10. 2026
Finland – Energy meters – PREQUALIFICATION FOR DELIVERY OF FLOW- AND ENERGY METERS FOR THE DISTRIBUTION OF HEATING AND COOLING
Fortum Power and Heat OyFínskoEnergy metersTermín nebol udanýPublikované 13. 10. 2026
Suomi – Sähkömittarit – Sähköverkon etämittauslaitteet ja luentapalvelu
Rauman Energia Sähköverkko OyFínskoElectricity metersMeter reading serviceTelecommunications servicesTermín nebol udanýPublikované 08. 10. 2026