Ireland – Construction work – Contract for the Construction of the National Cricket Centre - Contract One
Opis
Construction of the National Cricket Centre, Contract 1, which consists of the following elements: (1) Civil works including the Cricket Oval including the Wicket, 4,240 permanent seating bowl, bulk earthworks, boreholes and irrigation system, site infrastructure, utility services (2) Ancillary buildings comprising, Energy Centre (313m2), Maintenance building (536m2) and 2 WC blocks of 214m2 each (3) Landscaping works including grasscrete around the pitch hard standing to the concourse and soft landscaping The site is approximately 30 hectares, located in the eastern portion of the Sport Ireland campus at Abbottstown, Dublin 15. The project features a seating bowl around the main oval, with a diameter of 156 meters, consisting of 21 strips in total, 13 of which meet the minimum boundary requirements for men’s international matches. The seating capacity is 4,240, arranged in a 6-row configuration around most of the oval, offering excellent sight lines and ensuring a comfortable viewing experience for spectators
CPV kodi
Dokumenti in oddaja
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Povezana naročila
Ireland – Footpath construction work – Bealach Seanadh Mhach- Phase 2
Údarás Na Gaeltachta_289IrskaFootpath construction workFootbridge construction workSurface work for footpathsRok v 33 dnehObjavljeno na 05. nov. 2026
Ireland – Overhaul and refurbishment work – 10105 - FUEL TANK INSPECTIONS
Iarnród Eireann-Irish RailIrskaOverhaul and refurbishment workRok ni podanObjavljeno na 05. nov. 2026
Ireland – Construction work for sports facilities – Munster Technological University (MTU) High Performance Indoor Athletics Centre (HPAC) at Bishopstown Campus, Cork.
Munster Technological University.IrskaConstruction work for sports facilitiesSports hall construction workConstruction work for buildings relating to leisure, sports, culture, lodging and restaurantsRok v 7 dnehObjavljeno na 05. nov. 2026
Ireland – Construction work – Roof replacement and associated works at Cork College of FET St Gobans College, Seskin, Bantry, Co Cork.
Cork Education and Training BoardIrskaConstruction workConstruction work for college buildingsRok v 14 dnehObjavljeno na 04. nov. 2026