Írország – Magasépítési munka – Mary Immaculate College - Tailteann T2 Building Gym
Beskrivning
The full removal of the gym floor back to the original concrete slab, including the existing underfloor heating system, then new build-up of 55mm screed on new DPM. New high impact gym floor will then be done by others. Existing storage room to be converted into an office which involves new suspended ceiling, plasterboard walls, painting and skirting. Existing wall requires breaking through for a new window and door from the cardio area side. The large door to the gym will require removal, disposal and a new door fitted. The cardio area will have the existing two individual plasterboard and metal grid ceilings removed, then a new suspended ceiling fitted across the full room. Electrical works include the relocation of the existing distribution board from the corridor, into the new office and the removal and replacement of existing lighting. Mechanical works include new air conditioning works, including new outdoor units, new ducting
CPV-koder
Dokument & inlämning
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Liknande upphandlingar
Írország – Középiskola építése – Refurbishment works to 2no. Science labs, prep room and existing rooms at Stanhope Secondary School, Manor St, Stoneybatter, Dublin 7.
St. Joseph's Secondary School (Stanhope Secondary School)IrlandSecondary school construction workDeadline om 25 dagarPublicerad den 09 aug. 2026
Írország – Gépészeti szerelések – Wayside Celtic Renewable Energy Project
Wayside Celtic Football Club CLGIrlandMechanical installationsInstallation services of electrical and mechanical equipmentMechanical engineering installation worksDeadline om 18 dagarPublicerad den 09 aug. 2026
Írország – Egészségügyi épületek kivitelezése – EST_MW_UHL Block G – 72 Inpatient Bed Ward Expansion at University Hospital Limerick
Health Service Executive (HSE)IrlandConstruction work for buildings relating to healthHospital facilities construction workClinic construction workIngen frist angivenPublicerad den 09 aug. 2026
Írország – Sportlétesítmények kivitelezése – Construction of MUGA for Coolaney/Mullinabreena GAA Club at Achonry
Coolaney/Mullinabreena GAA clubIrlandConstruction work for sports facilitiesLandscaping work for sports grounds and recreational areasMulti-purpose sports facilities construction workDeadline om 25 dagarPublicerad den 09 aug. 2026