Zum Inhalt springen
Zurück zur Suche

Polen – Bauarbeiten – Electric Auxiliary Boilers

BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ,PolenVeröffentlicht am 19. Juli 2026
Keine Frist angegeben

Beschreibung

The scope of work for this package consists of design, furnishing materials, fabrication, inspection, testing, and documentation for packaged electrode type electric boiler, deaerator, blowdown flash tank, boiler feed system, chemical feed system complete with all required controls and instrumentation. The auxiliary boiler has estimated net steam output of 46,000 kg/hr at 13.79 bar. The packaged boiler shall be designed, fabricated, tested and stamped in accordance with EN standards; including but not limited to: a. PN-EN 13445 Unfired Pressure Vessels b. PN-EN 12953 Shell Boilers NOTE: The estimates provided above are APPROXIMATE only. The intent is to give bidders an idea of the scale of the project. Actual numbers will be included in official bid package.

CPV-Codes

Bauarbeiten

Unterlagen & Angebotsabgabe

KI-Zusammenfassung
Anmelden für KI-Zusammenfassung

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Ähnliche Ausschreibungen