Irland – Bauleistungen im Hochbau – Mary Immaculate College - Tailteann T2 Building Gym
Beschreibung
The full removal of the gym floor back to the original concrete slab, including the existing underfloor heating system, then new build-up of 55mm screed on new DPM. New high impact gym floor will then be done by others. Existing storage room to be converted into an office which involves new suspended ceiling, plasterboard walls, painting and skirting. Existing wall requires breaking through for a new window and door from the cardio area side. The large door to the gym will require removal, disposal and a new door fitted. The cardio area will have the existing two individual plasterboard and metal grid ceilings removed, then a new suspended ceiling fitted across the full room. Electrical works include the relocation of the existing distribution board from the corridor, into the new office and the removal and replacement of existing lighting. Mechanical works include new air conditioning works, including new outdoor units, new ducting
CPV-Codes
Unterlagen & Angebotsabgabe
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Ähnliche Ausschreibungen
Irland – Bau von weiterführenden Schulen – Refurbishment works to 2no. Science labs, prep room and existing rooms at Stanhope Secondary School, Manor St, Stoneybatter, Dublin 7.
St. Joseph's Secondary School (Stanhope Secondary School)IrlandBau von weiterführenden SchulenFrist in 25 TagenVeröffentlicht am 09. Aug. 2026
Irland – Maschinentechnische Installationen – Wayside Celtic Renewable Energy Project
Wayside Celtic Football Club CLGIrlandMaschinentechnische InstallationenInstallation von elektrischen und mechanischen EinrichtungenMaschinentechnische InstallationsarbeitenFrist in 18 TagenVeröffentlicht am 09. Aug. 2026
Irland – Bauarbeiten für Gebäude im Gesundheitswesen – EST_MW_UHL Block G – 72 Inpatient Bed Ward Expansion at University Hospital Limerick
Health Service Executive (HSE)IrlandBauarbeiten für Gebäude im GesundheitswesenBau von KrankenhauseinrichtungenBau von KlinikenKeine Frist angegebenVeröffentlicht am 09. Aug. 2026
Irland – Bauarbeiten für Sportanlagen – Construction of MUGA for Coolaney/Mullinabreena GAA Club at Achonry
Coolaney/Mullinabreena GAA clubIrlandBauarbeiten für SportanlagenLandschaftsgärtnerische Bauleistungen für Sport- und FreizeitanlagenBau von Mehrzweck-SportanlagenFrist in 25 TagenVeröffentlicht am 09. Aug. 2026