Irland – Bauarbeiten – Contract for the Construction of the National Cricket Centre - Contract One
Beschreibung
Construction of the National Cricket Centre, Contract 1, which consists of the following elements: (1) Civil works including the Cricket Oval including the Wicket, 4,240 permanent seating bowl, bulk earthworks, boreholes and irrigation system, site infrastructure, utility services (2) Ancillary buildings comprising, Energy Centre (313m2), Maintenance building (536m2) and 2 WC blocks of 214m2 each (3) Landscaping works including grasscrete around the pitch hard standing to the concourse and soft landscaping The site is approximately 30 hectares, located in the eastern portion of the Sport Ireland campus at Abbottstown, Dublin 15. The project features a seating bowl around the main oval, with a diameter of 156 meters, consisting of 21 strips in total, 13 of which meet the minimum boundary requirements for men’s international matches. The seating capacity is 4,240, arranged in a 6-row configuration around most of the oval, offering excellent sight lines and ensuring a comfortable viewing experience for spectators
CPV-Codes
Unterlagen & Angebotsabgabe
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Ähnliche Ausschreibungen
Irland – Bauarbeiten – Curlew Road Helthcare Campus, Drimnagh, Dublin 12
Health Service Executive (HSE)IrlandBauarbeitenKeine Frist angegebenVeröffentlicht am 03. Sept. 2026
Irland – Bauinstallationsarbeiten – Fire Remediation Works at Rowantree Court, Mullaghmonaghan, Monaghan
Oaklee HousingIrlandBauinstallationsarbeitenBaufertigstellungBrandschutzarbeitenFrist in 35 TagenVeröffentlicht am 03. Sept. 2026
Irland – Bauarbeiten für Schulen oder Forschungsanstalten – Proposed extension to existing school building including carpark and set down facilities, and all associated site development works at Scoil Naisiunta Mhuire Bainrioghan, Dunkerrin, Birr, Co. Offaly
Scoil Muire Bainrioghan (Dunkerrin NS)IrlandBauarbeiten für Schulen oder ForschungsanstaltenBauarbeiten für SchulgebäudeBau von GrundschulenFrist in 26 TagenVeröffentlicht am 03. Sept. 2026
Irland – Bauarbeiten – building extension project at Scoil Mhuire Agus Iosaf, Collooney, Co. Sligo.
Scoil Mhuire Agus IosafIrlandBauarbeitenBau von GrundschulenFrist in 31 TagenVeröffentlicht am 03. Sept. 2026