Poland – Construction work – Rozbudowa stacji 220/110 kV Recław dla przyłączenia nowych obiektów do KSE
Description
The subject of the Contract is the expansion of the 220/110 kV Recław station for connecting new facilities to the KSE, i.e. carrying out all necessary activities, including design work, legal formalities and construction work (including the purchase and supply of Equipment and Materials), necessary for the installation of the field in SE REC and the construction of the Railway Bridge along with a dedicated security building and an element not directly related to the bridge construction, which is the direct access to the station site. The construction of the Railway Bridge must be carried out in accordance with the guidelines for Railway Bridges (Annex No. 3 to Part II SWZ - Functional-User Programme (hereinafter PFU). The Contractor will be responsible for preparing the complete construction documentation, execution documentation and obtaining the Building Permit, the Permit for Use, carrying out the Works, bringing them to a flawless acceptance and preparing the post-construction documentation. 2. A detailed description of the subject of the contract is contained in Part II SWZ Functional-User Programme. 3. As part of the Contract, the Contracting Authority envisages the possibility of exercising the right of option. 4. Names and codes of the Common Procurement Vocabulary: 45100000-8, 45200000-9, 45300000-0, 45400000-1, 45500000-2, 71200000-0, 71300000-1, 71400000-2, 71500000-3 5. In all cases where the Contracting Authority, when describing the subject of the Contract by reference to standards, technical assessments, technical specifications and technical reference systems, as mentioned in Article 101(1)(2) and (3) of the Act, the Contracting Authority allows equivalent solutions described, if they allow to achieve characteristics or parameters no worse than those referred to. The above means that the Contractor may apply solutions described by the Contracting Authority "or equivalent". 6. The Contractor who refers to equivalent solutions described by the Contracting Authority is obliged to prove that the supplies, services or construction works offered by him meet the requirements specified by the Contracting Authority. The condition for the application of equivalent solutions is their written approval by the Contracting Authority. Differences between the invoked standards and their equivalents must be precisely described by the Contractor and submitted to the Contracting Authority during the implementation of the Contract - for approval. 7. The Contracting Authority informs that the local inspection is mandatory for Contractors. Before submitting an offer, the Contractor must inspect the site where the works constituting the subject of the submitted offer will be carried out and familiarise themselves with the conditions of contract implementation and the difficulties encountered. Proposals for the date of the site inspection should be sent to the e-mail address: [email protected]. Date of the inspection: first date by 27.08.2026; second date by 21.09.2026. Access to the site for the purpose of carrying out the local inspection requires the registration of inspection participants by completing the relevant Annexes No. 1, 2, 3 to the Instructions for granting and supervising permits for access and controlling the movement of materials and vehicles on the territory of the power stations of PSE S.A. and their submission via the Procurement Platform (tab "questions/information"), no later than 5 working days before the agreed date of the inspection. Site inspection location: SE RECŁAW is located in the town of RECŁAW. In the case of Contractors jointly applying for the subject contract, the presence of one of them is sufficient. In accordance with Article 226(1)(18) of the Act, the Contracting Authority will reject an offer which was submitted without a local inspection or without checking the documents necessary for the implementation of the contract available on site with the Contracting Authority, in cases where the Contracting Authority required this in the contract documents.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Construction work for communication lines – Ujęcie Dębina - odbudowa i modernizacja stawów infiltracyjnych - etap II
AQUANET S.A.PolandConstruction work for communication linesSite preparation workFencing, railing and safety equipment installation workDeadline in 11 daysPublished on Nov 11, 2026
Poland – Cycle path construction work – Budowa miejsc zrównoważonej mobilności miejskiej - ścieżki rowerowe, wiaty przystankowe na terenie miasta Lubina - Zadanie Nr 3
Gmina Miejska LubinPolandCycle path construction workConstruction work for pipelines, communication and power linesAncillary works for pipelines and cablesDeadline in 32 daysPublished on Nov 11, 2026
Poland – Works for complete or part construction and civil engineering work – BUDOWA PARKU WODNEGO W ŚWIDNICY
Gmina Miasto ŚwidnicaPolandWorks for complete or part construction and civil engineering workBuilding construction workDeadline in 34 daysPublished on Nov 11, 2026
Poland – Works related to water-distribution pipelines – Kontrakt W-2/R „Modernizacja ujęcia wody Drwęca-Jedwabno”
Toruńskie Wodociągi Sp. z o.o.PolandWorks related to water-distribution pipelinesPumping station construction workElectrical installation workDeadline in 8 daysPublished on Nov 11, 2026