Skip to content
Back to search
This tender has been withdrawn.

France – Architectural, construction, engineering and inspection services – Rénovation lourde dans l'immeuble situé du 4 au 18 rue F. Bonvin 75015 PARIS. Cf. la Description.

TERTIAIRE MIXTEFrancePublished on Jul 12, 2026
No deadline given

Description

This contract notice aims to select a service provider to carry out a complete mission as a Project Manager for the transformation of the Bonvin building. This building is constructed on plot BZ 15 with a surface area of 4682m². This building of approximately 14 600 m² SDP comprises 8 levels (from SS3 to R+4 and roof). It currently houses tertiary departments of the La Poste group, a nursery and a mail distribution platform. As part of the heavy renovation of the site, the following works are planned: excavation and asbestos removal work, envelope treatment (replacement of external joinery, rendering, internal insulation, greening and roof waterproofing), replacement of CTA, CFO/Cfa, CVC, GTB systems, connection to concessionaires, replacement of lifts, and redesign of internal layouts. Option: creation of residential areas. The consultation includes a single lot. Information on the limits regarding the number of candidates invited to participate: Maximum number: 4. Objective criteria for limiting the number of candidates: the client will retain a maximum of 4 candidates best ranked according to the criteria mentioned below. The number of awarding authorities envisaged for the candidates who have participated in the consultation is set at 1. The project is primarily a technical challenge. It will be part of a approach of sobriety, both in terms of architecture and technology. Cost and time optimisation will be a priority throughout the operation. The works must be completed within particularly tight deadlines, in order to minimise the impact on the occupants as much as possible. Finally, a prior declaration will be preferred to a building permit procedure. The project will be certified HQE Sustainable Building Taxonomy European Adaptation and Mitigation profile and labelled BBCA Renovation standard. It must achieve the objectives of the 2050 Tertiary Decree. The project must achieve a carbon performance in operation (energy consumption + refrigerant fluid leaks) of 12,8 kgCO2eq/m² in scopes 1 and 2 (excluding upstream energy scope 3). The project's objective is also to reduce the building's vulnerability to heat and flooding risks. The four pillars of La Poste Group's sustainable development policy must be the subject of substantiated proposals: energy, climate (carbon and adaptation), circular economy and biodiversity with an active search for mobilisable financial aids (grants, CEE, etc.) in order to optimise the economic balance of the operation.

CPV codes

Architectural, construction, engineering and inspection services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders