Germany – Construction work – Tiefstack Transformation (TiTra) Vergabeeinheit 1 - Demontage & Entsorgung

Hamburger Energiewerke GmbHGermanyPublished on Apr 01, 2026
No deadline given

Description

Currently, heat generation is primarily achieved through the two coal-fired steam generators of the Tiefstack power plant, which was commissioned in 1993. Additionally, the power plant has two peak load boilers fired with gas or heating oil, which are used solely for heat generation. The site also has a combined gas and steam turbine power plant (GuD) that was commissioned in 2009. As part of the "Tiefstack Transformation (TiTra)" program, Hamburger Energiewerke is converting the Tiefstack heating plant from coal to natural gas (H-Gas) to achieve the climate goals of the city of Hamburg and to reduce the coal share in district heating generation to zero by 2030. After the conversion, the previous power and heat extraction capacities are to be largely maintained. For this purpose, in particular, coal firing, ash and desulfurization plants, as well as coal-based air and flue gas systems, are to be dismantled. Lot 1 bundles these dismantling services and thus forms the basis for the new construction and conversion of the follow-up trades. The Tiefstack power plant is currently operated with two coal-fired steam generators in combined heat and power (CHP) mode, supplemented by a GuD power plant. Extensive coal-specific plant components are installed at the site, including, inter alia: - Flue gas desulfurization plant (REA building UHT) with absorber/scrubber, gypsum suspension tank, pumps, pipelines, GAVO, induced draft fans, silencers and flue gas ducts, - Electrostatic precipitators for dust separation, - Coal day bunkers, coal mills, primary air fans and ducts, burners with dust ducts, - Soot blowers and lance blowers, burner ash conveying, wet bottom ash and slag transport. These plants are unnecessary or obstructive for future gas operation and must be dismantled, disposed of or prepared for reuse in an orderly manner.

CPV codes

Construction workConstruction works for plants, mining and manufacturing and for buildings relating to the oil and gas industryBuilding demolition and wrecking work and earthmoving workSite preparation work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders