Germany – Building construction work – Max-von-der-Grün-Schule, Neubau in Modulbauweise, Totalunternehmer
Description
The City of Flensburg intends to construct a modular building for the Förderzentrum of the Max von der Grün-Schule. The focus of the Förderzentrum is on physical and motor development. The important project goal for the new building is to maximise the optimisation of the planning and construction time and to adhere to the cost ceiling. Therefore, both modular and system building methods (also as timber hybrid) as well as other building methods with a high degree of prefabrication are being considered. The contractor shall construct and hand over the building as a turnkey project, ready for use, operation and occupancy by 31.11.2027. The contractor assumes all services required for the construction, including planning, permitting, construction, interior finishing, technical building equipment, site installation, quality control and acceptance, as described in the FLB.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Siteworks – Ministerium für Wirtschaft, Touris., Landwirt. und Forsten des Landes S.- A. / Modernisierung der Überbetrieblichen Ausbildungsstätte in Iden, Baustelleneinrichtung
Ministerium für Wirtschaft, Tourismus, Landwirtschaft und Forsten des Landes Sachsen-AnhaltGermanySiteworksConstruction workDeadline in 29 daysPublished on Sep 07, 2026
Germany – Tiling work – Revitalisierung Bauhaus Trabelsdorf: BAU-11-Fliesenarbeiten
Gemeinde LisbergGermanyTiling workDeadline in 30 daysPublished on Sep 07, 2026
Germany – Floor laying and covering work – Revitalisierung Ringstraße 60 Los 16 Bodenleger
Leipziger Wohnungs-und Baugesellschaft mbHGermanyFloor laying and covering workDeadline in 41 daysPublished on Sep 07, 2026
Germany – Heating, ventilation and air-conditioning installation work – Sanierung Turnhalle Franz-Marc-Schule Geretsried 402 Heizung Sanitär
Landratsamt Bad Tölz - WolfratshausenGermanyHeating, ventilation and air-conditioning installation workGymnasium construction workDeadline in 22 daysPublished on Sep 07, 2026