Germany – General construction work for pipelines – WSP3_Bodenplatte
Description
The Stadtwerke Flensburg GmbH operates a combined heat and power plant at Batteriestraße 48 in 24939 Flensburg for the generation of electricity and district heating. In 2024, a heat storage unit 2 was commissioned at this location. This serves as a buffer storage for the district heating supply of the city of Flensburg with a capacity of approx. 29,000 m3 of treated district heating water. Originally, this heat storage unit was connected in parallel with heat storage unit 1, which has been in operation at the power plant site for approximately 50 years. After the commissioning of heat storage unit 2, a condition assessment of heat storage unit 1 was carried out, which showed that refurbishment within economic parameters is not feasible. For this reason, heat storage unit 1 is currently being dismantled and will be replaced by the new heat storage unit 3 to be erected at the same location. Heat storage unit 3 is to be constructed as a pressureless heat storage unit with a steam cushion, identical in design to the heat storage unit 2 already in operation at the site. This means that a heat storage capacity of min. 900 MWh with a maximum storage temperature of 98 °C and a return temperature of 65 °C (Delta T 33°C) and, in addition, a maximum charging and discharging power of 90 MW is to be achieved. The expected dimensions of the storage unit are an internal diameter of approx. 42 m and a maximum fill height of approx. 21 m. Due to the parallel connection to heat storage unit 2, the same geodetic height of the maximum fill level must be achieved in both storage units. The scope of supply and services includes in particular: Planning and manufacture of the base plate for the heat storage unit, see also 00_Projektbeschreibung.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Tiling work – Estrich- und Fliesenarbeiten - Neubau Zusammenlegung Müllstationen
Universitätsklinikum DüsseldorfGermanyTiling workFloor-screed worksFloor-tiling workDeadline in 31 daysPublished on Aug 31, 2026
Germany – Construction work – A 71, Los 3 - Üko-INS TB Haseltal u. Üko-Austausch TB Werratal
Die Autobahn GmbH des Bundes - NL OstGermanyConstruction workConstruction work for bridgesDeadline in 30 daysPublished on Aug 31, 2026
Germany – Ventilation and air-conditioning installation work – Raumlufttechnische Anlagen Lüftungstechnik
Land Berlin – Sondervermögen Immobilien des Landes Berlin (SILB) c/o BIM Berliner Immobilienmanagement GmbHGermanyVentilation and air-conditioning installation workDeadline in 30 daysPublished on Aug 31, 2026
Germany – Electrical fitting work – SV-MBR-260828-002 - WZWA1: Werkswohnungsbau Westend-/Zschokkestraße, Elektro inkl. Blitzschutz
Stadtwerke München GmbHGermanyElectrical fitting workBuilding installation workDeadline in 35 daysPublished on Aug 31, 2026