France – Construction work – Marché global de performance pour la rénovation énergétique du lycée Camille Claudel à VAUREAL (95)
Description
Located at 4 Avenue Federico Garcia Lorca in Vauréal (95490), the high school occupies a built complex intended for teaching, also including a CDI, a refectory and staff accommodation. The establishment accommodates approximately 1,340 students and has nearly 130 teaching and administrative staff members. The site was constructed in several phases: buildings A, B, C, E and F date from 1989, building D from 1990, and a prefabricated building was added in 2021, outside the project perimeter. The total SHON area is 14,037 m². Building E is on one level (ground floor), buildings C and F are two-storey (R+1), while buildings A, B and D are three-storey (R+2). The high school is classified as an ERP of type R, 1st category, with a housing component. The programme is presented in the consultation regulations.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Works related to water-distribution pipelines – Travaux de renouvellement du réseau d'eau potable et des branchements d'eau, rue du chemin de fer à La Wantzenau
Eurométropole de StrasbourgFranceWorks related to water-distribution pipelinesDeadline in 29 daysPublished on Jul 19, 2026
France – Foul-water piping construction work – Travaux de réhabilitation des ouvrages d'assainissement non visitables sur le territoire de EAU d'AZUR - 2 lots
Régie Eau d'Azur (06)FranceFoul-water piping construction workNo deadline givenPublished on Jul 19, 2026
France – Urban development construction work – Concession d'aménagement pour l'opération Horizon Trois Couronnes avec transfert de risque économique
Ville BidartFranceUrban development construction workDeadline in 60 daysPublished on Jul 19, 2026
France – Building alteration work – Travaux de réhabilitation du Conservatoire Place Saint-Jean à St-Omer
COMMUNAUTE D'AGGLOMERATION DU PAYS DE SAINT-OMERFranceBuilding alteration workAsbestos-removal workSite preparation and clearance workDeadline in 10 daysPublished on Jul 19, 2026