Skip to content
Back to search

Romania – Construction work – Lucrări de construcții pentru obiectivul de investiții "Realizarea unui pavilion nou administrativ în Cazarma 3073 Tunari - 2023-I-3073 București "

UNITATEA MILITARA 02384RomaniaPublished on Nov 18, 2026
32 days left

Description

The real estate investment aims to build a new administrative pavilion within the 3073 Tunari barracks, including the arrangement of all necessary external networks for the pavilion's operation. Currently, the staff carry out their activities in inadequate, undersized spaces that do not ensure the minimum surfaces imposed by Disposition DDI-12/2023, supplemented and amended by Disposition DDI-14/2023, leading to low productivity and the inability to carry out activities under optimal conditions. By implementing the new real estate investment project, the new building will meet both the immediate needs of the administrative staff and the future requirements generated by the development of the military unit. This will ensure a functional framework, with sufficiently sized and partitioned spaces according to the norms and standards in force, providing the premises for efficient administration and activities carried out under optimal conditions. The proposed real estate investment project consists of carrying out investment works within the 3073 Tunari barracks through the realization of the following objects:

• Object 1. Decommissioning of existing constructions (building J1 and building B1);

• Object 2. Land arrangement;

• Object 3. Realization of new administrative pavilion;

• Object 4. Connections/hook-ups to the on-site networks, as well as network extensions;

• Object 5. Drainable basin;

• Object 6. Decommissioning of external networks, including the existing drainable basin (for building B);

• Object 7. Realization of building B's sanitary drainage;

• Object 8. Relocation of existing PSI post;

• Object 9. Rearrangement of access roads;

• Object 10. Integrated security system for military objective – S.I.S.O.M.

The number of days within which clarifications can be requested before the deadline for submission of tenders/applications: 18. The deadline, expressed in number of days, within which the contracting authority will respond clearly and completely to all requests for clarification is 10 days before the deadline set for the submission of tenders.

CPV codes

Construction workSite preparation workSecondary road construction workBuilding installation work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders