Skip to content
Back to search

Germany – Construction project management services – Fritz-Haber-Institut der Max-Planck-Gesellschaft, Berlin Umbau und Erweiterung Gebäude T: Projektsteuerung

Max-Planck-Gesellschaft , GV-BauabteilungGermanyPublished on Jul 14, 2026
No deadline given

Description

The Fritz-Haber-Institut (FHI) was founded in 1911 as the Kaiser-Wilhelm-Institut für Physikalische Chemie und Elektrochemie in Berlin-Dahlem and was incorporated into the MPG in 1953. The focus of the research activities is the fundamental understanding of elementary processes in physical chemistry and thus the relationship between structure, reactivity and dynamics at surfaces, interfaces, nanostructures, molecules and clusters. There is currently a significant shortage of highly equipped wet-chemical laboratory space with a design suitable for automated operation. To meet the demand, building T is to be converted and expanded into a laboratory building. The office cubes arranged on the north side of the hexagonal building and the central hall are to be partially demolished and the technical equipment completely dismantled. The resulting spaces, between the two partially demolished cubes, are to be used to "insert" the extension building into the existing building. In this new building, all highly equipped rooms, such as laboratories and hazardous materials storage, as well as the majority of the central technology and technical infrastructure, are to be housed on three floors, one of which is a basement. The "core" of the new area is to be the AI-controlled automated laboratory, which is to be created on the ground floor. On the floor above, wet chemistry laboratories with evaluation workstations are to be created, which can be subdivided into several laboratory rooms. The future building T is to have a net usable floor area (NUF) of approx. 1,400 m² (approx. 3,370 m² gross floor area), with the planned usable areas distributed as follows: - a 80m² chemistry store, approximately 440 m² robot-operated AI-supported large chemistry laboratory, approximately 440 m² wet chemistry laboratories, approximately 340 m² office space, approximately 100 m² storage space. For the NUF 7, a space requirement of approximately 100 m² has been determined, and for the technical areas approximately 500 m². The estimated total construction costs (KG 200 to 700) for the conversion and extension amount to approximately 22.800.000 € net. During the planning phase, cost estimates are to be prepared separately for the costs of the extension and the conversion/renovation of the existing building and combined in a summary. Further details can be found in the description of measures and services in Annex 07 and the drawings in Annex 08. Further project details will be provided in the second stage of the procedure. The project book will be sent to the selected bidders with the invitation to tender. The subject of this VgV tendering procedure are the required services of "project control" according to § 2 Heft No. 09 AHO, 6th edition, project stages 1 to 5, areas of activity A to E, plus special services. A detailed description of the services is contained in Annex 04. Special note regarding bidder questions due to special external events (e.g. Sars-COV-2 or Ukraine war): Please take into account any possible or recognizable impairments in your offer, e.g. with regard to the availability of materials and products, labor, any delayed submission of required evidence, effects on any subcontractors, etc. Please submit any questions arising in this context in good time before the deadline for submission via the eVergabe messaging system.

CPV codes

Construction project management services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders