Back to search
France – Industrial chimneys – Marché de travaux relatif à la conception, ingénierie détaillée, fabrication, livraison, mise en oeuvre et mise en service d'ouvrages destinés à évacuer les gaz de combustion des productions bois-énergie de la chaufferie de Cognin du réseau de chauffage urbain exploité par R3C.
DALKIA SAFrancePublished on Jan 20, 2026
No deadline givenDescription
The services covered by this lot include the design and construction of works intended to evacuate the combustion gases from two 8 MW biomass boilers or a 16 MW boiler cooled after passing through two condensers. The services may include, in particular, the supply, installation and connection of flues, elbows, registers, possible sound traps, condensate drainage systems, the chimney, insulation, complete lightning protection systems, the framework and access walkways.
CPV codes
Industrial chimneys
Documents & submission
AI summary
Sign in for an AI summaryContains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Road-surface painting work – Travaux de signalisation horizontale sur les voies rapides et dans les tunnels de la Métropole de Lyon
Métropole de Lyon DGEEPFranceRoad-surface painting workDeadline in 33 daysPublished on Sep 10, 2026
France – Construction work for buildings relating to railway transport – Travaux de conception du Pôle d'Echanges Multimodal (PEM) de Saint Cyr Les Lecques à Saint Cyr sur Mer (83270)
SNCF Gares & ConnexionsFranceConstruction work for buildings relating to railway transportNo deadline givenPublished on Sep 10, 2026
France – Structural shell work – P202618PA - Réhabilitation énergétique de l’IUT de Vannes : Enveloppe et systèmes
UBSFranceStructural shell workRoof-framing workWaterproofing workDeadline in 26 daysPublished on Sep 10, 2026
France – Multi-dwelling buildings construction work – Réhabilitation de la Résidence Cartault - 92800 PUTEAUX
OPH Rives de Seine HabitatFranceMulti-dwelling buildings construction workDemolition workStructural shell workDeadline in 25 daysPublished on Sep 10, 2026