Skip to content
Back to search

Germany – Architectural, construction, engineering and inspection services – Neubau Campus Zentralklinikum Magdeburg – NCZMD (BA1 – BA4, UA1 – UA2) MSR / GLT – (Mess-, Steuerungs- und Regelungstechnik / Gebäudeleittechnik) Planung und Ausführung

IPS Immobilien- und Projektmanagament Gesellschaft Sachsen-Anhalt mbHGermanyPublished on May 10, 2026
No deadline given

Description

The Universitätsklinikum Magdeburg A.ö.R. (UKMD), together with the Medical Faculty (FME) of the Otto-von-Guericke University (OvGU), forms the Universitätsmedizin Magdeburg (UMMD). This collaboration unites research, teaching (FME) and patient care (UKMD). With approximately 1,100 beds, the Universitätsmedizin is the largest hospital in the city of Magdeburg and the largest medical facility in northern Saxony-Anhalt. The hospital's physical structure is particularly characterized by decentralization. The main campus, with a total area of approximately 300,000 sqm, is located at Leipziger Straße 44. The University Clinic for Obstetrics, Gynecology and Reproductive Medicine, as well as the inpatient department of the University Eye Clinic, are located at the external site at Gerhart-Hauptmann-Straße 35 (approximately 3 km as the crow flies). The main campus is characterized by a pavilion structure. Clinics, outpatient departments, laboratories, logistics, as well as research and teaching are decentralized across the site. In total, there are 26 clinics and 19 institutes, as well as other independent or affiliated departments, distributed across both sites. In addition to research and teaching, the Universitätsmedizin Magdeburg offers the full spectrum of a multi-professional and highly specialized medical maximum care. The entire Universitätsmedizin employs approximately 4,300 employees in research, teaching, patient care and administration. Furthermore, approximately 1,500 students are enrolled at the Medical Faculty, as well as others in the Master's program in Immunology. The current physical structure of the UKMD is characterized by a dislocated building structure, obsolete technical infrastructure, long distances and outdated functional structures. There is an urgent need for action to prepare the UMMD for the future challenges of university medicine and to solve pressing structural problems. The new Central Hospital is intended to bring together the previously dislocated clinics and functional units of the Universitätsklinikum in a centralized and structurally-functional optimized structure, thus resolving an outdated situation. Taking into account the existing areas in buildings 60a and 60b, a large part of the clinical areas and a predominant proportion of the total usable areas of the UKMD will be located in the Central Hospital complex in the future. The new construction of the "New Campus Central Hospital" is the largest construction project in the state of Saxony-Anhalt and is critical to the future viability of the site at Leipziger Straße. The planning and construction implementation is divided into several individual, interdependent sub-projects. Due to the complexity of the construction measures and the heterogeneous nature of the projects, this is necessary both in terms of content and organization. The current budget approved for the overall measure is approximately 1 billion €, half of which is allocated solely to the new construction of the Central Hospital (construction phases 1 and 2). The focus of the building function should be on the harmony of medically up-to-date and future-proof processes, efficient operational structures and economical solutions. In addition, the following requirements must be mandatory considered: It must be ensured that modern, safe, competitive and legally compliant healthcare can be provided at the Universitätsmedizin Magdeburg site and that current safety risks are minimized. The planning should be future-proof and innovative. A high degree of automation should be taken into account. The planning of the Central Hospital must be carried out in such a way that a highly flexible building is created. This flexibility should enable re-use by other medical specialties; possibly as a result of a changed medical strategy. The current and future legal requirements for CRITICAL INFRASTRUCTURE with regard to physical resilience and IT security must be taken into account in the planning and execution, insofar as they are applicable to the Central Hospital. The most complex and medically important project is the new construction of the new central building for inpatient care, which, according to the specifications of the present master plan, directly adjoins the existing buildings House 60a and House 60b and is intended to form a unit with them. The new central building is a highly complex project in planning, execution and operation, but also in the preparation of the procedure, with multifactor dependencies and a large number of users. It is also challenging to integrate the new building into the existing structures, taking into account existing, partially listed buildings. Due to the complex requirements for the new construction of the Central Hospital, the client, IPS GmbH, has decided to implement this part of the overall project as an Integrated Project Delivery (IPA). In total, the following IPA partners will be commissioned for planning and execution: Key trade 1: ELT execution – Technical equipment (electrical systems) Key trade 2: HLS execution – Technical equipment (without electrical systems) Key trade 3: Specialized planning services Technical equipment Key trade 4: Extended project planning services Key trade 5: MSR/GLT planning and execution Key trade 6: Medical technology planning and execution (cost group 473), turnkey with cost groups 300 and 400 Key trade 7: Specialized planning services Structural engineering Key trade 8: Execution services Interior construction Key trade 9: Execution services extended rough construction/special foundation engineering

CPV codes

Architectural, construction, engineering and inspection servicesArchitectural, engineering and planning servicesEngineering servicesBuilding servicesSwitching station installation workElectrical engineering installation worksOther electrical installation workAutomation system

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders