Türkiye – Railway construction works – Design and Construction of Infrastructure & Superstructure Works including Electrification under the İstanbul North Rail Crossing Project (INRAIL)
Description
The Ministry of Transport and Infrastructure, Directorate General of Infrastructure Investments, Türkiye (hereinafter - teh Ministry), has received financing from the World Bank through Ministry of Treasury and Finance towards the cost of the INRAIL Project. The Project is being jointly financed by the Asian Infrastructure Investment Bank, the Asian Development Bank, the European Bank for Reconstruction and Development, the Islamic Development Bank, and the OPEC Fund for International Development. The Project will finance the construction of a 127 km greenfield railway line designed to bypass the Istanbul Metropolitan Area and establish a high-capacity overland link across the Istanbul Strait (Bosphorus). The line will be double-tracked, electrified, fully signalized, and mixed-use, capable of carrying both passengers and freight, with a maximum freight carrying capacity of 50 million tons per year. The proposed railway line will originate at Çayrova station on the Asian side and terminate at Çatalca station on the European side, crossing the Istanbul Strait by utilizing the existing track space allocated on the Yavuz Sultan Selim Bridge (YSS Bridge), also known as the Third Bosphorus Bridge, located at the northern end of the Istanbul Strait. The Ministry intends to apply a portion of the loan proceeds toward payments under the contract(s) for the "Design and Construction of Infrastructure and Superstructure Works, including Electrification" subdivided into four Lots as listed below. The scope of works covered under this procurement package as a whole (all four lots together) encompasses the design and construction including electrification of 122.3 km of double-track main line and 4.7 km of single-track connection lines, 5 twin-tube Tunnel Boring Machine (TBM) tunnels totaling 36.2 km, 22 double-track New Austrian Tunneling Method (NATM) tunnels totaling 23.3 km, 17 cut-and-cover tunnels totaling 3.7 km, two viaducts and 40 bridges totaling 22.1 km, Stations, etc. The scope of works covered under each lot is specified in the RFP document. The Telecommunication and Signalling Works are not included in this procurement package and will tendered separately. The Ministry now invites sealed Proposals from eligible Proposers for the Design and Construction of Infrastructure & Superstructure Works including Electrification subdivided into the four lots below. Proposers may submit Proposal for one or more lot(s): Lot 1 — Construction and Electrification Works for the Çayrova – Sabiha Gökçen Airport – Kurtdomu Corridor (28,49 km); Lot 2 — Construction and Electrification Works for the Kurtdomu – Alibahadr Corridor (25,76 km); Lot 3 — Construction and Electrification Works for the Alibahadr – YSS Bridge – Mithatpaa Corridor (32,14 km); Lot 4 — Construction and Electrification Works for the Mithatpaa – stanbul Airport – Çatalca Corridor (39,49 km).
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Norway – Construction work – Turnkey contractor for Nordkjosbotn School, 1st - 10th years, second publication.
Balsfjord kommuneNorwayConstruction workWorks for complete or part construction and civil engineering workConstruction work for school buildingsDeadline in 34 daysPublished on Aug 20, 2026
Czechia – Construction work – Dostavba Základní školy a Gymnázia Trojská
MČ Praha - TrojaCzechiaConstruction workConstruction work for buildings relating to education and researchDeadline in 10 daysPublished on Aug 20, 2026
Latvia – Construction work – Būvniecības ieceres dokumentācijas izstrāde, autoruzraudzība un būvdarbi objektam “Plānītes upes esošā tilta nojaukšana un jaunas caurtekas izbūve uz pašvaldības autoceļa Jaunbaloži–Buki Īslīces pag
Bauskas novada pašvaldībaLatviaConstruction workEngineering design servicesSupervision of project and documentationDeadline in 18 daysPublished on Aug 20, 2026
Germany – Excavating and earthmoving work – VE 501 (Erd-, Kanal- und Straßenbau)
Gemeinde BüsumGermanyExcavating and earthmoving workSewerage workRoad construction worksDeadline in 31 daysPublished on Aug 20, 2026