Germany – Medical equipments – Erweiterung und Sanierung Klinikum Altmühlfranken Weißenburg 1. BA (Unterbauabschnitt 1a)
Description
In 2008, the Klinikum Altmühlfranken in Weißenburg was expanded to include a specialist medical centre. Now, due to age-related issues and deficiencies in space and functionality, the hospital is to be comprehensively renovated and expanded in two construction phases. This request for planning and equipment is for the 1st construction phase (BA1), which includes the two sub-phases (BA1A) and (BA1E).
BA1 – 1st Construction Phase
In the first construction phase, the existing functional wing will be replaced by a new building (BA1A) and subsequently renovated and converted for future use (BA1B). In addition, the existing entrance hall will be expanded and renovated (BA1E).
BA1A - New Building: The new building in the south-east of the site is planned as a compact structure with an ideal floor plan organisation and direct access to the main entrance. The new building will house all the highly equipped core functions of the hospital: - Basement: AEMP, laboratory, changing rooms, archive, laundry exchange, and technical facilities - Ground Floor: ZEA/ZNA with a new patient admission area and outpatient entrance, radiology, endoscopy, functional diagnostics, and maternity - 1st Floor: Operating department with same-day surgery, intensive care, and on-call duty - 2nd Floor: Technical facilities
The floor plan provides a centrally located public access axis running east-west, along which the individual functional areas and the vertical access with lift core are arranged. On the 1st floor, an inner courtyard will also be created, ensuring the lighting of the corresponding departments. In this custom-built new building, optimal hospital processes will be achieved and the primary functional deficiencies of the existing structure will be eliminated. The autonomous construction of the new functional wing (BA1A) will allow the ongoing operation in the existing building to continue uninterrupted.
BA1E - New Building/Renovation of Entrance Hall: The new building and its connection to the existing structure will create a new entrance situation and thus a new, future-oriented urban design for the hospital. To this end, the existing entrance hall will be expanded/straightened on the entrance level, creating a clear and unambiguous access. The entrance hall, located in the centre of the hospital, will be comprehensively renovated and will house general functions: - Ground Floor: Service facilities with reception/post office, pastoral care and social services - Upper Floors: Access with waiting areas
During this renovation, a temporary main entrance can be provided from the north at the transition to the new building.
BA1B - Renovation of Existing Building, Outlook (not part of this BAP): After the core functions of the hospital have been moved to the new building (BA1A), the original functional wing will be converted accordingly and the following functions will be located there: - Basement: Supply/disposal, storage, housekeeping and transport services, maintenance/repair, waste disposal, pharmacy, and technical facilities - Ground Floor: Physical therapy, medical services, on-call duty, catering with visitor/employee cafeteria with outdoor area - 1st Floor: Medical services, administration - 2nd Floor: Chapel, technical facilities
As part of the comprehensive renovation, a courtyard will be created on the 1st floor to provide lighting for the adjacent functions. The entire renovation can be carried out in one go, with only 4/7 of the existing catering facilities in the basement remaining initially and being moved back and converted accordingly after completion of the new catering facilities on the ground floor.
BA2 - 2nd Construction Phase, Outlook (not part of this BAP)
In the second construction phase, nursing care will be modernised at the Klinikum Altmühlfranken in Weißenburg. There are two options for this: - Renovation and expansion of the existing nursing homes - New nursing buildings next to the newly constructed functional wing (BA1A), which, due to its positioning and floor plan layout, allows for an ideal connection to new nursing units.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Pharmaceutical products – Abschluss nicht-exklusiver Rabattvereinbarungen nach § 130a Abs. 8 SGB V zu den genannten Wirkstoffen mit Abschlussmöglichkeit im Rahmen des sogenannten Open-House-Verfahrens.
KKH Kaufmännische KrankenkasseGermanyPharmaceutical productsDeadline in 26,697 daysPublished on Nov 26, 2026
Germany – Medical breathing devices – Lieferleistung von Langzeitbeatmungsgeräten für die Intensivmedizin
Zentralklinik Ostfriesische Meere gGmbHGermanyMedical breathing devicesNo deadline givenPublished on Nov 26, 2026
Germany – Physical therapy devices – 1/DLII6/VN131 - RV Stoßwellentherapiegerät, handelsüblich
Bundesamt für Infrastruktur, Umweltschutz und Dienstleistungen der BundeswehrGermanyPhysical therapy devicesRepair and maintenance services of medical and surgical equipmentInstallation services of physical therapy equipmentDeadline in 41 daysPublished on Nov 26, 2026
Germany – Medical equipments – Lieferung und Inbetriebnahme von Infusionstechnik inkl. Softwarepflege
Klinikum Garmisch-Partenkirchen GmbHGermanyMedical equipmentsNo deadline givenPublished on Nov 26, 2026