Skip to content
Back to search
This tender has expired.

Poland – Engineering design services – Wykonanie kompletnej dokumentacji projektowej wraz z uzyskaniem wszystkich decyzji administracyjnych niezbędnych do przeprowadzania robót budowlanych realizowanych w Nadleśnictwie Dębica w ramach projektu pn. Kompleksowy projekt adaptacji lasów i leśnictwa do zmian klimatu – mała retencja oraz przeciwdziałanie erozji wodnej na terenach nizinnych – kontynuacja (MRN3)” (V postępowanie powtórzone)

Skarb Państwa Państwowe Gospodarstwo Leśne Lasy Państwowe Nadleśnictwo DębicaPolandPublished on Oct 04, 2026
Deadline passed

Description

The subject of the order is the preparation of complete design documentation (hereinafter referred to as the documentation) along with obtaining the necessary building law opinions, agreements and administrative decisions, and performing author supervision for the following tasks:

1.1. Task settlement number: 03-04-1.1-05

Task name: Part 3: Preparation of design documentation for the task: Construction of a dry reservoir in unit 28a of Wolica Forestry; Location: - Wolica Forestry; forest addresses: 03-04-1-01-28-a (Natura 2000 area – "Las nad Braciejową" PLH 180023); - County: Dębicki; City Dębica; cadastral area 6; parcel number 2577

Description: - Construction of a dry reservoir by damming a watercourse with an earthen embankment, with the installation of a pipe allowing free water flow and reinforcement with a stone apron at the inlet and outlet. The planned volume of retained water is 400 m3 on an area of approx. 0.3 ha.

2. The documentation will include:

2.1. Design documentation containing:

2.1.1. Architectural design within the scope including the specificity of building works.

2.1.2. Executive design

2.2. Cost documentation containing:

2.2.1. Investment cost estimate prepared in accordance with the Regulation of the Minister of Development and Technology of 20 December 2021 on the determination of methods and bases for the preparation of the investment cost estimate, calculation of planned costs of design works and planned costs of building works specified in the functional-user program (Journal of Laws 2021 item 2458),

2.2.2. Bill of quantities, which should include a list of basic works to be carried out in the technological order of their execution, along with their detailed description or indication of the bases for determining the detailed description, and indication of the appropriate technical specifications for the execution and acceptance of building works. The bill of quantities should include, as annexes, the calculation and quantification of units of basic works indicating the method of calculating the bill of quantities positions.

Full name of the order: "Preparation of complete design documentation along with obtaining all the administrative decisions necessary to carry out the building works carried out in the Dębica Forest District as part of the project entitled Comprehensive project for the adaptation of forests and forestry to climate change – small retention and prevention of water erosion in lowland areas – continuation (MRN3)" (V repeated procedure – part 3)

CPV codes

Engineering design servicesEngineering design services for the construction of civil engineering worksBridge-design servicesProject and design preparation, estimation of costsSupervision of project and documentation

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders