France – Sewage work – Remplacement des prétraitements et traitement primaires existants STEP du Corniguel Phase 1 : Candidatures
Description
This consultation concerns the replacement of existing pre-treatment and primary treatment facilities at the Corniguel wastewater treatment plant in Quimper, on behalf of Quimper Bretagne Occidentale. The programme comprises two phases and two lots, distributed as follows:
Phase 1 (Preparation period: site preparation, contractor's execution studies and VISA of the project manager)
Phase 2 (Work execution: works, commissioning, personnel training and reception)
Firm lot: including phases 1 and 2 (Preparation period: site preparation, contractor's execution studies and VISA of the project manager, including the siphon pipeline from Meilh Kerdour. Work execution: works, commissioning, personnel training and reception)
Optional lot including phase 2 (Work execution: works on the siphon pipeline from Meilh Kerdour, commissioning, personnel training and reception)
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Wall-covering work – Accord-cadre à bons de commande pour des travaux d'entretien courant de Peinture Revêtements Muraux et Revêtements de sols
OPH de la Haute-SaôneFranceWall-covering workFloor-covering workDeadline in 44 daysPublished on Sep 08, 2026
France – Installation of road lighting equipment – Travaux de Génie Electrique sur le territoire de Grand Besançon Métropole
Grand Besançon MétropoleFranceInstallation of road lighting equipmentInstallation of outdoor illumination equipmentDeadline in 33 daysPublished on Sep 08, 2026
France – Wall-covering work – Accord-cadre à bons de commande en multi-attribution pour des travaux d'entretien courant de peinture et revêtements muraux
OPH de la Haute-SaôneFranceWall-covering workDeadline in 44 daysPublished on Sep 08, 2026
France – Floor-covering work – Accord-cadre à bons de commande en multi-attribution pour des travaux d'entretien courant de revêtements de sols
OPH de la Haute-SaôneFranceFloor-covering workDeadline in 44 daysPublished on Sep 08, 2026