France – Construction work – Chemin d’Ablis repowering- Marché de travaux lot VRD

EDF power solutionsFrancePublished on Oct 06, 2026
No deadline given

Description

Project to repower the existing wind farm at Chemin d’Ablis, commissioned in 2008, consisting of 26 MM92 2MW turbines for a total capacity of 52MW, and located in the communes of Vierville, Léthuin, Chatenay, Gouillons, Baudreville, Levesville-la-Chenard, Neuvy-en-Beauce and Fresnay-L’Evêque in the department of Eure-et-Loir (28) in the Centre Val de Loire region. The new farm will still consist of 26 WTGs, with locations fairly close to the old ones, for a total installed capacity of 102MW (connection to existing HTB substation). This contract concerns the VRD works.

CPV codes

Construction work