Skip to content
Back to search
This tender has expired.

Poland – Environmental engineering consultancy services – Opracowanie raportów na potrzeby przeprowadzenia ponownej oceny oddziaływania na środowisko, dla Przedsięwzięcia pn. Budowa i eksploatacja pierwszej w Polsce Elektrowni Jądrowej, o mocy elektrycznej do 3750 MWe, na obszarze gminy Choczewo

Polskie Elektrownie Jądrowe Sp. z o.o.PolandPublished on Sep 10, 2026
Deadline passed

Description

The subject of the Contract in the framework of orders based on a framework agreement will be the preparation of Reports on the reassessment of the environmental impact of the Investment „Construction and operation of the first nuclear power plant in Poland, with an electrical capacity of up to 3750 MWe, in the area of the municipality of Choczewo. 2. The detailed description of the subject of the Contract is contained in Annex A to the Draft Contractual Provisions, which constitute Annex No. 1 to the SWZ. 3. The subject Procedure is conducted in the form of an unrestricted tender based on Article 132 in conjunction with Article 378 of the Act of 11 September 2019 - Public Procurement Law (i.e. Journal of Laws of 2026, item 793, as amended) (hereinafter: Pzp Act). 4. The subject Procedure is also subject to the provisions of the Act of 29 June 2011 on the preparation and implementation of investments in the field of nuclear energy facilities and related investments (Chapter 6) (i.e. Journal of Laws of 2025, item 1156, as amended), hereinafter referred to as the Investment Act. 5. Whenever this Notice refers to the Specification or SWZ, it means the Specification of Contract Conditions together with the annexes, which are an integral part thereof. 6. The Contracting Authority informs that the public procurement procedure will be conducted using the Contracting Authority's Procurement Platform. 7. The address of the website of the conducted Procedure: https://pz.pej.pl (under this address, changes and explanations of the content of the SWZ and other documents of the Contract directly related to the Procedure for the award of the Contract will be made available). 8. In this procedure, communication between the Contracting Authority and the Contractors, including the submission of Offers, exchange of information, and transmission of documents or declarations, with the exception of the exceptions indicated in the Pzp Act, is carried out by means of electronic communication through the Platform, available at the address: https://pz.pej.pl. 9. A Contractor intending to participate in the procedure for the award of a contract must have an account on the Procurement Platform. Registration and maintenance of an account on the Procurement Platform and use of the Platform is free of charge. 10. The technical and organisational requirements for using the Platform are specified in the Platform Regulations (available at the internet address https://pz.pej.pl/user/terms). A Contractor, by participating in the procedure for the award of a contract, i.e. by registering or logging in (in the case of having an account on the Platform), accepts the terms of use of the Platform, specified in the Regulations, and recognises them as binding. 11. Detailed information on the means of electronic communication is contained in point 17 of the SWZ. 12. The Contracting Authority, pursuant to Article 139(1) of the Pzp Act, provides for a so-called reverse procedure, i.e. first carries out an examination and evaluation of the Offers to determine the highest-rated Offers, and then carries out the subject qualification of the Contractors, whose Offers have been highest-rated in terms of lack of grounds for exclusion and fulfilment of the conditions for participation in the Procedure. Information in this regard is contained in point 15 of the SWZ. 13. The Contractor, in order to confirm the lack of grounds for exclusion, is obliged to submit with the Offer: 13.1) Pursuant to Article 393(1)(3) of the Pzp Act, in order to demonstrate the lack of grounds for exclusion, as referred to in point 13.3 of the SWZ, the Contractor submits a declaration, the template of which is Annex No. 10 to the SWZ. 13.2) In the case of relying on the capabilities or situation of other entities providing resources, the Contractor, together with his declaration, as referred to in point 13.1) above, also submits a declaration from the entity providing the resources, confirming the lack of grounds for exclusion. 13.3) In the case of joint bidding for a contract by Contractors, the declaration, as referred to in point 13.1) above, is submitted by each of the Contractors jointly bidding for the Contract. 13.4) In the case where a Contractor plans to entrust part of the contract, constituting more than 10% of the contract value, to be carried out by subcontractors and suppliers, and they are known, the Contracting Authority requires the Contractor to present a declaration, as referred to in point 13.1) above, in respect of those subcontractors and suppliers. 14. The Contracting Authority, pursuant to Article 139(2) of the Pzp Act, in connection with point 2.3 of the SWZ, will require the submission of a JEDZ declaration, exclusively from the Contractor, whose Offer is highest-rated. Information in this regard is contained in point 15 of the SWZ. 15. The Contracting Authority, before selecting the most advantageous offers, will call upon the Contractors, whose offers have been highest-rated, to submit, within a specified period, not shorter than 10 days, declarations and subject evidence, current as of the date of submission, as referred to in point 15 of the SWZ. 16. Pursuant to Article 42(2) of the Investment Act, the Contracting Authority informs that, in the event that, within a specified period, the Contractor does not submit the subject evidence required by the Contracting Authority, as referred to in point 15.4 of the SWZ, or does not submit powers of attorney, or submits the evidence required by the Contracting Authority, as referred to in point 15.4 of the SWZ, containing errors, or submits invalid powers of attorney, the Contracting Authority will call upon him to submit the appropriate subject evidence or powers of attorney, within a specified period, no more than three times, unless, despite their submission, the Contractor's Offer is subject to rejection or the Procedure would have to be invalidated. The evidence submitted at the request of the Contracting Authority should confirm the fulfilment by the Contractor of the conditions for participation in the Procedure and the fulfilment by the offered services of the requirements specified by the Contracting Authority, no later than on the day on which the deadline for the submission of Offers expires. 17. Information on the subject evidence relating to Contractors having their registered office or place of residence outside the territory of the Republic of Poland is contained in points 15.6-15.8 of the SWZ.

CPV codes

Environmental engineering consultancy servicesEnvironmental impact assessment for construction

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders