Skip to content
Back to search

Germany – Engineering design services for mechanical and electrical installations for buildings – Neubau 6-gruppige Kindertagesstätte am Volksfestplatz in Germering - Fachplanung Technische Ausrüstung (HLS)

Große Kreisstadt GermeringGermanyPublished on Feb 08, 2026
No deadline given

Description

Used as a gravel and waste pit in the 1940s, the Volksfestplatz hosted the eponymous Volksfest from the 1950s until 2016. The fully asphalted area was most recently used as a parking lot and for a weekly market. Since the Volksfestplatz in its current total size will no longer be needed in the future, the city of Germering has examined and decided on a de-sealing and green space redesign of the site. To optimize the planning, the contracting authority conducted a realization competition with an urban design concept part: The realization part of the competition included the future public open spaces, designed with attractive green structures in the western part of the Volksfestplatz and with paved areas for market use in the eastern part. The concept part comprised the urban design positioning and property demarcation for a 6-group daycare centre in the spatial context of the existing daycare centre “Kleiner Muck” on the west side of the Volksfestplatz. Based on the competition entry, the land-use plan IG 12.2 was drawn up for the western site area, the new daycare centre to be planned and the existing one. As information, the competition entry of the 1st prize winner (NMM [Nicole M. Meier] Landscape Architecture, Munich with von Angerer Architects and Urban Planners GmbH, Munich), who has already been commissioned with the planning for the realization part, as well as the land-use plan are available for inspection. _____ The subject of the contract to be awarded is the planning of a 6-group daycare centre with a gross floor area (GFA) of approx. 1,130 m². The daycare centre to be planned, like the existing one, is to be accessed via the access road "Zum kleinen Muck" and to complement the existing stock in an architecturally adequate manner. The angled, single- to two-storey building forms a traffic-free access courtyard with the existing building. Due to soil contamination, the rooms are to be proven without a basement according to the current state of knowledge. The group rooms should be variably usable for both nursery and kindergarten groups. It is currently being clarified whether the catering will be provided by its own kitchen or by co-supply from the existing kitchen in the daycare centre “Kleiner Muck”. All outdoor areas necessary for the daycare centre are to be proven at ground level. In the implementation of the planning of the new daycare centre, the spatial proximity of the construction site to the existing daycare centre, which will remain in operation, on the one hand, and to the section-by-section conversion of the Volksfestplatz into green and market square areas on the other hand, must be taken into account. The recommendations of the specialist planning office for contaminated sites and soil, Nickol + Partner GmbH, must be observed during planning. _____ The contracting authority places particular emphasis on the cost-effectiveness of the project. The aim is a cost-optimized type of construction with rational and economical floor plans according to the principles of simple construction (e.g. building type E). The buildings should be expected to have economically justifiable construction costs through construction and material selection and to ensure low maintenance in the long term, particularly through the use of durable and low-maintenance materials, robust building services and low energy consumption. In addition, special attention should be paid to the planning of a sustainable building: Future-oriented design concepts are expected to achieve the highest possible overall cost-effectiveness, comfort and architectural quality with the lowest possible use of energy and resources. The aim is a type of construction that is economical with raw materials and energy and reduces environmental impact to the lowest possible level. The daycare centre is to be constructed in timber construction, also with the aim of shortening construction times. Energetically, the contracting authority aims for an overall concept of architecture and energy efficiency, which first examines the exploitation of passive measures (LowTech principles) before the use of active measures. In general, the use of local, renewable energies is sought. A photovoltaic system is to be installed on the flat roofs.

CPV codes

Engineering design services for mechanical and electrical installations for buildingsEngineering services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders