Hungary – Engineering design services – Zugló vasúti megállóh. akadálymentesítés tervezése
Description
Barrier-free and environmental development of Zugló railway station: • Location, street, house number: Budapest, XIV. district – Zugló railway station • Cadastral number: 32304/1, 32180/7, 32314/1 • Facility name: underpass, staircase, passenger lift, platform surfacing, platform canopy, ticket office building, station forecourt, passenger information devices, platform furniture • Location: 100a Budapest (Nyugati pu.) - Szolnok railway line 41 km section The contracting authority draws attention to the fact that the design of the barrier-free development of the Zugló railway station, which is part of the electrified suburban and national public transport railway line 100a, involves the following basic tasks to be carried out within the framework of the contract to be awarded: - a comprehensive review, modification and updating of the previous (predecessor) design documentation as necessary; - the design of the demolition of the existing entrance building located on the platform and the structurally connected reinforced concrete platform canopy, as well as the examination and design of the appropriate level, modern replacement of the functions operating in the building (ticket sales, waiting, passenger toilet, commercial functions) on the area next to the railway embankment; - the design of 2 new underpasses leading under 2 tracks and the barrier-free (external passenger lift + staircase) platform access connected to it; - the possibility of using the area freed up by the demolition of the platform building should be particularly evaluated during the examination, and the most favorable location variant from a passenger traffic point of view should be indicated; - the design of a possible further (3rd) exit connection on the terminal side of the station, which will have an annual passenger traffic of 1,874,690 in 2025, in the Semsey Andor street – Szugló street axis, in the interest of ensuring the connection between the districts; - platform elevation to sk+55 level; - extension of the steel platform canopy towards the starting point, examining the static adequacy of the existing section, and determining any necessary interventions (with particular attention to architectural aspects) – the intervention affects at least 580 m2 of area as specified in the design disposition; - the establishment of static and dynamic passenger information systems, taking into account the services of BKK and MÁV-Csoport; - renovation of the existing underpass, design of a new underpass cover; - the establishment/extension of necessary telecommunications, space lighting, and safety systems; - the designation of connecting routes, in cooperation with the capital and the district, with a focus on transfer options. Optional item: design management The Act LXIX of 2023 on the order of state construction investments, in its section 19 (1), defines the design management, which may be tendered as an option during the implementation phase of the state construction investment. The task of the winning bidder within the framework of design management: - to monitor the implementation of the project; - to check the implementation of the design documentation prepared by it; - to draw attention to factors hindering or promoting the implementation according to the plan; - to make proposals for the professional solution of technical uncertainties and problems arising during the implementation; - to facilitate the solution of professional questions arising during the implementation in connection with the design documentation - to ensure on-site cooperation until the completion of the commissioning procedure. The full scope of the tasks to be performed, their detailed description and conditions are contained in the Design Disposition (and its related annexes), as well as the Draft Contract. In the case of full authorization and full implementation designs, design is carried out based on a building information model (BIM) according to the 31/2024. (VIII. 22.) ÉKM decree. The design must also be carried out in the model space, and the processing and publication of the images of these are mandatory tasks during consultations and in the case of certain design chapters (e.g. BIMx model space for navigation, spatial sections, views, illustrative perspective drawing, etc.). The BIM requirements are contained in the design task description and draft contract.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Hungary – Technical inspection services – Műszaki ellenőri, beruházás lebonyolítói szolg.
Nemzeti Adó- és VámhivatalHungaryTechnical inspection servicesDeadline in 29 daysPublished on Nov 22, 2026
Hungary – Architectural design services – Tervezési szolgáltatás, Szekszárdi Járásbíróság
Országos Bírósági HivatalHungaryArchitectural design servicesDeadline in 10 daysPublished on Nov 19, 2026
Hungary – Engineering design services – Úttervezések 2026
Székesfehérvár Megyei Jogú Város ÖnkormányzataHungaryEngineering design servicesArchitectural design servicesDeadline in 10 daysPublished on Nov 18, 2026
Hungary – Technical inspection and testing services – Vasúti felépítményi és hídvizsgálati tevékenység
MÁV Pályaműködtetési Zártkörűen Működő RészvénytársaságHungaryTechnical inspection and testing servicesDeadline in 30 daysPublished on Nov 17, 2026