Skip to content
Back to search
This tender has expired.

Poland – Construction work for water and sewage pipelines – „Budowa sieci wodociągowej w ul. Błękitnej, ul. Szoszowskiej, ul. Dworskiej i ul. Danuty Siedzikówny w Żorach”

Przedsiębiorstwo Wodociągów i Kanalizacji Żory Sp. z o.o.PolandPublished on Oct 07, 2026
Deadline passed

Description

The subject of the contract is the construction of a water supply network in ul. Błękitnej, ul. Szoszowskiej, ul. Dworskiej and ul. Danuty Siedzikówny in Żory. Scope of the contract: TASK I: Construction of the water supply network in ul. Błękitnej and ul. Szoszowskiej in Żory: - PE-HD PE 100 RC SDR 17 PN 10 DN/OD 160 [mm] - length 504.7 [mb]; - PE-HD PE 100 RC SDR 17 PN 10 DN/OD 90 [mm] - length 4.00 [mb]. The existing ground levels may deviate from the ground levels in the developed project, therefore the levels of the tops of the valves must be adapted to the existing ground. TASK II: Construction of the water supply network in ul. Dworskiej, ul. Szoszowskiej and ul. Danuty Siedzikówny in Żory: - From node W1 to W21 - PE-HD PE 100 RC SDR 17 PN 10 DN/OD 160 [mm] - length 655m [mb]; - From node W17 to W28 - PE-HD PE 100 RC SDR 17 PN 10 DN/OD 90 [mm] - length 136.00 [mb]. NOTE: The documentation for TASK II also covers the scope that is not the subject of the contract and should be omitted in the valuation and excluded from implementation, i.e. the water supply network from W21 to W27. The existing ground levels may deviate from the ground levels in the developed project, therefore the levels of the tops of the valves must be adapted to the existing ground. 2. A detailed description and scope of the contract subject is specified in the project documentation attached to the SWZ with certificates of no objection to the construction notification, technical specifications for the performance and acceptance of construction works. 3. The contractor is obliged to implement the contract on the principles and conditions described in the model contract constituting Annex no. 6 to the SWZ. 4. The contractor is obliged to implement the subject of the contract in accordance with the applicable standards and technical knowledge, specified, among others, by the Act of 7 July 1994 on Construction Law (i.e. Journal of Laws of 2026 item 524 as amended) with due diligence, proper work organization and OHS principles.

CPV codes

Construction work for water and sewage pipelinesGeneral construction work for pipelinesRoadworks

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders