Poland – Construction work – Przebudowa linii WN 110 kV wraz z przebudową GPZ Iława (etap 1 i etap 2)
Description
The subject of the order is the execution of construction and assembly works for the task: Reconstruction of the 110 kV line along with the reconstruction of GPZ Iława (Phase 1 and Phase 2), divided into Parts: 1.1. Part No. 1 (also referred to as Phase 1 in the project documentation): Reconstruction of the 110 kV line relation GPZ Iława – GPZ Iława Wschód, GPZ Iława Wschód – GPZ Lubawa, GPZ Lubawa – GPZ Ostróda to a double-circuit line and the expansion of GPZ Iława, 1.2. Part No. 2 (also referred to as Phase 2 in the project documentation): Reconstruction of the 110 kV line relation GPZ Ostróda – GPZ Ostróda Wschód, GPZ Ostróda Wschód – GPZ Gietrzwałd to a double-circuit line and the construction of a 110 kV cable line within GPZ Ostróda. 2. The scope of the works includes: 2.1. in the scope of Part No. 1 – reconstruction of the single-circuit overhead 110 kV line relation GPZ Iława – GPZ Iława Wschód, GPZ Iława Wschód – GPZ Lubawa, GPZ Lubawa – GPZ Ostróda to a double-circuit line with the construction and reconstruction of telecommunications infrastructure along the route of the designed and existing relations as well as the expansion of the existing 110 kV substation in GPZ Iława in the scope enabling the introduction of the second circuit of the 110 kV line, 2.2. in the scope of Part No. 2 - reconstruction of the single-circuit overhead 110 kV line relation GPZ Ostróda – GPZ Ostróda Wschód, GPZ Ostróda Wschód – GPZ Gietrzwałd to pole No. 71 (existing pole No. 99) to a double-circuit line with the construction and reconstruction of telecommunications infrastructure along the route of the designed and existing relations as well as the construction of a section of the 110 kV cable line within GPZ Ostróda. 2. The detailed description of the subject of the order contains the project documentation and STWiORB, which is Annex No. 11A to SWZ (for Part No. 1) and Annex No. 11B to SWZ (for Part No. 2). The contracting authority requires that the subject of the order be executed in accordance with the guidelines (Annex No. 15 to SWZ) and instructions as well as the standards (Annex No. 16 to SWZ) and the designed provisions of the contract (Annex No. 13 to SWZ) indicated in this documentation. 3. The contracting authority requires that the execution of the subject of the order be carried out exclusively using (irrespective of its method or scope) software, materials, products or devices that originate: 3.1. from the Member States of the European Union or 3.2. from third countries that are parties to the Agreement on Government Procurement of the World Trade Organization or other international agreements, of which the European Union is a party, guaranteeing on the basis of reciprocity and equality access to the public procurement market, whereby the determination of origin is made in accordance with art. 60 para. 1 and 2 of Regulation (EU) No 952/2013 of the European Parliament and of the Council of 9 October 2013 establishing the Code of Customs. The contracting authority requires that, in addition, the execution of the subject of the order does not include: any ICT product, ICT service or ICT process, which have been indicated in the recommendation of the Plenipotentiary for Cybersecurity, issued on the basis of art. 33 para. 4 of the Act of 5 July 2018 on the national cybersecurity system, stating the negative impact of such ICT products, ICT services or ICT processes on the fundamental interest of state security (art. 226 para. 1 point 17 of the Public Procurement Law) and any ICT product, the type of which has been determined in the decision of the minister competent for informatization on recognising the supplier as a high-risk supplier, issued on the basis of art. 67b para. 15 of the Act of 5 July 2018 on the national cybersecurity system, or any ICT service or ICT process specified in such a decision (art. 226 para. 1 point 19 of the Public Procurement Law). The term "ICT product", "ICT service" and "ICT process" shall be understood to mean, respectively, a product, service and process, as referred to in art. 2 para. 12–14 of Regulation (EU) 2019/881 of the European Parliament and of the Council of 17 April 2019 on ENISA (the European Union Agency for Cybersecurity) and on cybersecurity certification in the field of information and communication technologies and repealing Regulation (EU) No 526/2013 (the Cybersecurity Act), in the meaning of the Act of 5 July 2018 on the national cybersecurity system. 4. The contracting authority, taking into account that the completion of the implementation of the contract in each of the Parts will take place after 01.01.2028, informs that it will not accept any devices using fluorinated greenhouse gases with a global warming potential of 1 or greater, as on the date of acceptance of the construction work it will not be able to put such a device into use in accordance with the content of art. 13 para. 9 lit. a) and c) of Regulation (EU) 2024/573 of the European Parliament and of the Council of 7 February 2024 on fluorinated greenhouse gases, amending Directive (EU) 2019/1937 and repealing Regulation (EU) No 517/2014. 5. The contracting authority allows the submission of partial offers. The contractor may submit only one offer for any chosen Part or for two Parts of the order. 6. The contractor will provide the contracting authority with a warranty on the terms described in Annex No. 13 to SWZ. 7. The order is an element of the project entitled "Development of intelligent medium and high voltage power grids Energa-Operator S.A. O/Płock and O/Olsztyn in order to increase the potential for connecting RES", which is applying for co-financing from the funds of the European Infrastructure, Climate, Environment Fund 202
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Construction work – Rozbudowa dróg powiatowych ulicy Katowickiej oraz ulicy Wojska Polskiego wraz z budową zintegrowanego centrum przesiadkowego „Mijanka” w Świętochłowicach
Gmina ŚwiętochlowicePolandConstruction workSite preparation workBuilding demolition and wrecking work and earthmoving workDeadline in 9 daysPublished on Sep 29, 2026
Poland – Construction work – Odbudowa infrastruktury wodno-kanalizacyjnej uszkodzonej przez powódź na obszarze Gminy Kłodzko.
"Wodociagi Gminy Kłodzko" sp. z o.o.PolandConstruction workEngineering design servicesWater-treatment plant construction workDeadline in 37 daysPublished on Sep 29, 2026
Poland – River regulation and flood control works – Budowa lewego wału rzeki Biała w km rzeki 6+600-8+345 os. Koszyce, m. Tarnów – etap III roboty budowlane
Państwowe Gospodarstwo Wodne Wody PolskiePolandRiver regulation and flood control worksSite preparation workWorks for complete or part construction and civil engineering workDeadline in 6 daysPublished on Sep 29, 2026
Poland – Stadium construction work – Modernizacja i rozbudowa infrastruktury sportowej stadionu miejskiego w Grodzisku Mazowieckim
Gmina Grodzisk MazowieckiPolandStadium construction workConstruction workSite preparation and clearance workDeadline in 9 daysPublished on Sep 29, 2026