France – Construction work – Marché appel d'offres ouvert - lot 11 A et lot 11 B
Description
The contract covers the following two lots: LOT 11A – HARD FLOOR COVERINGS and LOT 11B – TECHNICAL FLOORS. It involves the execution of hard floor covering and technical floor works, including the preparation of substrates, the installation of screeds and levelling compounds, as well as the implementation of waterproofing and protection systems. It also includes the laying of floor and wall coverings such as polished concrete, resin, tiles, faience and entrance mats, as well as all associated accessories and equipment necessary for the perfect finishing of the works. The contract also includes the supply and installation of raised technical floors and their ancillary works, notably fire and acoustic cut-offs, steps, ramps, technical hatches and specific finishes. All services must be carried out in accordance with the rules of the art and the prescriptions of the project management. This call for tenders follows a declaration without follow-up for reasons of general interest.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Overhaul and refurbishment work – ACCORD CADRE A BONS DE COMMANDE – TRAVAUX DE MONTEE EN GAMME DANS LES LOGEMENTS A USAGE LOCATIF DU PATRIMOINE IN’LI AURA
in'li AURAFranceOverhaul and refurbishment workDeadline in 32 daysPublished on Sep 03, 2026
France – Sewerage work – Travaux de réhabilitation des caniveaux à fentes des autoroutes A8, A50, et A57 du réseau ESCOTA.
ESCOTA SOCIETE DES AUTOROUTES ESTEREL, COTE D'AZUR, PROVENCE, ALPESFranceSewerage workDeadline in 32 daysPublished on Sep 03, 2026
France – Construction work – Construction d'un bâtiment de 185 lits
EPD de GrugnyFranceConstruction workExcavating and earthmoving workStructural shell workDeadline in 44 daysPublished on Sep 03, 2026
France – Museum construction work – Construction du musée de Saint-Gilles
La SATFranceMuseum construction workDressed stoneworkStoneworkDeadline in 23 daysPublished on Sep 03, 2026