Switzerland – Construction work – Um- und Neubau BLS-Werkstätte Oberburg – Gleistiefbau
Description
Project Presentation
BLS has operated a workshop for heavy and light maintenance of trains at the Oberburg site since 1977. Following the closure of the Bern Aebimatt site, the BLS Board of Directors decided on 28.10.2016 to concentrate future maintenance at the three sites of Spiez, Bönigen and Oberburg. A new workshop for the operational maintenance of the S-Bahn fleet is to be commissioned at the Oberburg site (Municipality of Burgdorf). The existing buildings and track facilities are to be demolished in phases and replaced by new constructions.
Order / Description of Services
* Excavation of old ballast
* Track construction (substructure renewal, sub-ballast layer)
* Track drainage (including pump pressure line)
* Cable trench construction (cable ducts, cable pits and crossings)
* FL and SA foundations
* Relocation of various plant lines (Swisscom and Localnet, hydrant)
* Dismantling and restoration of temporary level crossings
* Embankments, service roads and ruderal areas
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Switzerland – Construction work – BKP 272.2 Allgemeine Metallbauarbeiten
Stiftung Alterswohnungen der Stadt Zürich - SAW (Fokus Baumanagement)SwitzerlandConstruction workDeadline in 41 daysPublished on Jul 28, 2026
Switzerland – Earthmoving work – Contrat - Cadre : Création de plans d'eau et revitalisation de fossés
Etat de Genève - Département du territoire (DT) - Office cantonal de l'agriculture et de la nature (OCAN)SwitzerlandEarthmoving workCut and fillLandscaping workDeadline in 40 daysPublished on Jul 27, 2026
Switzerland – Installation of metal structures – AESC 2040 Extension et renouvellement STEP de Pensier - Filière eau - Lot 007 Serrurerie
Association intercommunale pour l'épuration des eaux des bassins versants de la Sonnaz et de la Crausaz (AESC)SwitzerlandInstallation of metal structuresStructural products and parts except prefabricated buildingsCable, wire and related productsDeadline in 54 daysPublished on Jul 27, 2026
Switzerland – Construction work – Weierstrasse - Erneuerung und Ausbau zur Begegnungszone
Gemeinde Rüti ZHSwitzerlandConstruction workDeadline in 37 daysPublished on Jul 27, 2026