Switzerland – Construction work – Um- und Neubau BLS-Werkstätte Oberburg – Gleistiefbau
Description
Project Presentation
BLS has operated a workshop for heavy and light maintenance of trains at the Oberburg site since 1977. Following the closure of the Bern Aebimatt site, the BLS Board of Directors decided on 28.10.2016 to concentrate future maintenance at the three sites of Spiez, Bönigen and Oberburg. A new workshop for the operational maintenance of the S-Bahn fleet is to be commissioned at the Oberburg site (Municipality of Burgdorf). The existing buildings and track facilities are to be demolished in phases and replaced by new constructions.
Order / Description of Services
* Excavation of old ballast
* Track construction (substructure renewal, sub-ballast layer)
* Track drainage (including pump pressure line)
* Cable trench construction (cable ducts, cable pits and crossings)
* FL and SA foundations
* Relocation of various plant lines (Swisscom and Localnet, hydrant)
* Dismantling and restoration of temporary level crossings
* Embankments, service roads and ruderal areas
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Switzerland – Construction work – Opere di pavimentazione - Città di Lugano - Infrastrutture Cassarate
Aziende Industriali di Lugano (AIL) SASwitzerlandConstruction workSurface work for roadsDeadline in 39 daysPublished on Sep 10, 2026
Switzerland – Construction work for buildings relating to leisure, sports, culture, lodging and restaurants – Construction d’une salle de sport polyvalente et mise en séparatif des collecteurs d’eaux usées et d’eaux claires communaux - LOT 2 Travaux de l'entreprise de maçonnerie
Commune de Bois-d'AmontSwitzerlandConstruction work for buildings relating to leisure, sports, culture, lodging and restaurantsDeadline in 40 daysPublished on Sep 10, 2026
Switzerland – Construction work for buildings relating to leisure, sports, culture, lodging and restaurants – Construction d’une salle de sport polyvalente - LOT 20 Chauffage
Commune de Bois-d'AmontSwitzerlandConstruction work for buildings relating to leisure, sports, culture, lodging and restaurantsDeadline in 40 daysPublished on Sep 10, 2026
Switzerland – Construction work for buildings relating to leisure, sports, culture, lodging and restaurants – Construction d’une salle de sport polyvalente - LOT 23 Installations sanitaires
Commune de Bois-d'AmontSwitzerlandConstruction work for buildings relating to leisure, sports, culture, lodging and restaurantsDeadline in 40 daysPublished on Sep 10, 2026