Skip to content
Back to search
This tender has expired.

Germany – Medical equipments – Erweiterung und Sanierung Klinikum Altmühlfranken Weißenburg 1. BA (Unterbauabschnitt 1a)

Kommunalunternehmen Klinikum AltmühlfrankenGermanyPublished on Sep 13, 2026
Deadline passed

Description

In 2008, the Klinikum Altmühlfranken in Weißenburg was expanded to include a specialist medical centre. Now, due to age-related issues and deficiencies in space and functionality, the hospital is to be comprehensively renovated and expanded in two construction phases. This application for construction and equipment planning includes the 1st construction phase (BA1) and, within it, the two sub-phases (BA1A and BA1E).

BA1 – 1st Construction Phase

In the first construction phase, the existing functional wing will be replaced by a new building (BA1A) and then renovated or converted for subsequent use (BA1B). In addition, the existing entrance hall will be expanded and renovated (BA1E).

BA1A - New Building: The new building in the south-east of the site is planned as a compact structure with an ideal floor plan organisation and direct access to the main entrance. The new building will house all the hospital's highly equipped core functions: - Basement: AEMP, laboratory, changing rooms, archive, laundry exchange, technology - Ground floor: ZEA/ZNA with new patient access and outpatient entrance, radiology, endoscopy, functional diagnostics, maternity - 1st floor: operating department with same-day surgery, intensive care, on-call duty - 2nd floor: technology

The floor plan provides for a centrally located public access axis running east-west, along which the individual functional areas and the vertical access with lift core are arranged. On the 1st floor, an inner courtyard will also be created to ensure the lighting of the corresponding departments. In this custom-built new building, optimal hospital processes will be achieved and the primary functional deficiencies of the existing structure will be eliminated. The autonomous construction of the new functional wing (BA1A) will allow ongoing operations in the existing structure to continue uninterrupted.

BA1E - New Building/Renovation of Entrance Hall: The new building and its connection to the existing structure will create a new entrance situation and thus a new, future-oriented urban design for the hospital. To this end, the existing entrance hall will be expanded/straightened on the entrance level, creating a clear, unambiguous access. The entrance hall, located in a central position in the hospital, will be comprehensively renovated and will house general functions: - Ground floor: service facilities with reception/post office, pastoral and social services - Upper floors: access with rest areas

During this renovation, a provisional main entrance can be provided from the north at the transition to the new building.

BA1B - Renovation of Existing Structure, Outlook (not part of this BAP): After the core functions of the hospital have been moved to the new building (BA1A), the original functional wing will be converted accordingly and the following functions will be located there: - Basement: supply/disposal, storage, housekeeping and transport service, maintenance/repair, waste disposal, pharmacy, technology - Ground floor: physical therapy, medical service, on-call duty, catering with visitor/employee cafeteria with outdoor area - 1st floor: medical service, administration - 2nd floor: chapel, technology

As part of the comprehensive renovation, a courtyard will be created on the 1st floor as a major structural intervention to provide lighting for the adjoining functions. The entire renovation can be carried out in one go, with only 4/7 of the existing catering in the 1st basement initially remaining in operation and being moved back and converted accordingly after completion of the new catering on the ground floor.

BA2 - 2nd Construction Phase, Outlook (not part of this BAP) In the second construction phase, nursing care at the Klinikum Altmühlfranken in Weißenburg will then be modernised. There are two options for this: - Renovation and expansion of the existing nursing homes - New nursing buildings next to the newly constructed functional wing (BA1A), which, with its positioning and floor plan layout, allows for an ideal connection to new nursing buildings.

CPV codes

Medical equipmentsVideo equipmentMedical information systemsInstallation services of medical equipment

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders