Skip to content
Back to search
This tender has expired.

Germany – Heating, ventilation and air-conditioning installation work – 24-006-FRR Bildungs- und Begegnungsstätte "ROBBE" / Neubau der Kita - Bauabschnitt 01

Gemeindevorstand RodenbachGermanyPublished on Aug 19, 2026
Deadline passed

Description

Planned in 3 construction phases are the new build of a two-storey kindergarten (Phase 1), the demolition of the existing kindergarten (Phase 2) and the new build of a two-storey family centre (Phase 3). The site has the three-storey town hall in the western part, and another part of the site is still occupied by a single-storey kindergarten. Planning includes the demolition of this kindergarten as soon as the new kindergarten can be put into operation. The new builds of the kindergarten and family centre, as well as the existing town hall, will be accessed via a square south of Buchbergstrasse. The kindergarten houses 4 group rooms for children under 3 and over 3 on the ground floor, all facing east towards the kindergarten's outdoor areas with their associated ancillary rooms. In the western part of the building, there is a large multi-purpose room, dining hall, kitchen and staff rooms. The administrative offices of the kindergarten form the transition to the single-storey mini-club in the northern part of the building. The mini-club will be used for day care with 2 additional group rooms. Further group rooms are located on the upper floor. The layout is similar to the ground floor, with the group rooms facing east and a preceding colonnade, which, together with the external staircase, serves not only as an escape route but also as an additional outdoor play area. A large roof terrace is planned in the southern part of the building. Phase 1 includes the new build of the kindergarten and day care, positioned so that the open spaces of the existing kindergarten can remain in operation as far as possible, but a separate open area for the new kindergarten can still be created at the eastern boundary of the site. Phase 2 includes the relocation of the existing kindergarten to the new build and the subsequent demolition of the existing kindergarten. Phase 3 concerns the new build of the family centre in a central location. Here too, the operation of the new kindergarten and its accessibility for the transition phase of the new build of the family centre is almost unrestricted. Type of operation, of the facility The new build of the kindergarten comprises 7 groups - under 3 and over 3 - with a maximum of 147 children on the ground and upper floors. Two group rooms are planned for the day care/mini-club, where up to 27 children can be cared for during the day. The number of employees amounts to a maximum of 18 people on the ground floor and a maximum of 9 people on the upper floor. The kitchens on the ground and upper floors will be operated with approx. 4-6 employees. All uses in the kindergarten and day care are limited to services.

CPV codes

Heating, ventilation and air-conditioning installation work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders