Germany – Structural shell work – Los B2 erweiterter Rohbau Turbinengebäude, LUKO und Betriebsgebäude
Description
The GfA operates a waste-fired combined heat and power plant in Geiselbullach for the generation of electricity and heat. As part of the increase in district heating decoupling, the installation of a new steam turbine is planned. The construction measures include several lots. The subject of the application is Lot B2 extended rough construction. The subject of Lot B2 extended rough construction is:
- the construction of a new turbine building in solid construction with the dimensions LxWxH: approx. 24.00m x 11.00m x 24.00m (TBG)
- the construction of the base slab of a new lightweight operational building with the dimensions LxWxH: approx. 6.50m x 9.50m x 7.00m (BTG)
- the construction of a strip foundation grid for the new air condenser LxWxH: approx. 36.00m x 13.00m x 24.50m (LuKo)
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Landscaping work – Freianlagen Füssen
Stadt FüssenGermanyLandscaping workExcavating and earthmoving workBuilding demolition and wrecking work and earthmoving workDeadline in 31 daysPublished on Sep 03, 2026
Germany – Sanitary fixture installation work – Neubau Dreifeld-Sporthalle am Gymnasium Franziskaneum - LOS 23 -Sanitärinstallation
Stadt MeißenGermanySanitary fixture installation workSports hall construction workDeadline in 34 daysPublished on Sep 03, 2026
Germany – Heating, ventilation and air-conditioning installation work – Polizeirevier Werdau, Erweiterung
Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Zentrale, Zentralstelle Vergabe- und VertragsmanagementGermanyHeating, ventilation and air-conditioning installation workDeadline in 31 daysPublished on Sep 03, 2026
Germany – Sanitary works – Neubau von Erweiterungsanbauten an der Franziskus Schule - Abwasser-, Wasser-, Gasanlagen
Kreis ViersenGermanySanitary worksPlumbing and drain-laying workDeadline in 31 daysPublished on Sep 03, 2026