Austria – Switchgear – 36-kV-Mittelspannungsschaltanlage, UW Vorderwald

Vorarlberger Energienetze GmbHAustriaPublished on Aug 27, 2026
No deadline given

Description

The Vorarlberger Energienetze GmbH intends to undertake the complete renewal of the Vorderwald substation. The substation (from 1977) is to be brought up to the latest state of the art in the years 2028-2030. For this project, a new 36-kV, metal-enclosed, gas-insulated medium-voltage switchgear with double busbar will be procured. The installation of the new switchgear in the existing switchgear room will require the use of a temporary switchgear solution outside the operating building. This tender includes the supply, installation and commissioning of the new 36-kV switchgear.

CPV codes

SwitchgearSwitching station installation work