Skip to content
Back to search

Germany – Construction work – Los 1 Marstallinnenhof und Außenbereiche der Seitenflügel

Staatliches Bau- und Liegenschaftsamt NeubrandenburgGermanyPublished on Oct 21, 2026
37 days left

Description

Preparation of Marstallumfeld Site Lot 1 Marstallinnenhof and Exterior Areas of the Side Wings Demolition Works: approx. 1,400 m² turf removal approx. 1,750 m² gravel surface breaking approx. 170 m² slab removal approx. 600 m² paving removal for re-installation approx. 70 m² planting area clearance approx. 110 m curb removal New construction of paved areas approx. 230 m² water-bound path surfacing approx. 260 m² cobblestone paving, incl. base layers approx. 970 m² polygonal paving, incl. base layers approx. 360 m² natural stone slabs, incl. base layers approx. 260 lfm edging with curbs approx. 160 lfm granite edging, incl. granite edging natural stone fixation at the base area of the building Equipment approx. 5 units bollards approx. 2 units benches approx. 3 units waste containers approx. 10 units bicycle racks Drainage approx. 570 m renovation of existing rainwater drainage pipes, incl. excavation New drainage approx. 680 m rainwater drainage pipes consisting of PE-HD DN150, DN200, DN250, DN300, DN400, incl. excavation, incl. manhole chambers PE DN600, concrete prefabricated shafts D. 1.00 m, inspection chambers PE DN 400 approx. 430 m surface drainage, full seepage pipe, PE DN 150, incl. excavation approx. 60 m drainage channel gutters DN 100, DN150, polymer concrete, incl. covers D400, in single lengths approx. 13 m drainage channel slot drain NW 150, polymer concrete, D 400 approx. 140 m paving channel, natural stone paving, W. 50 cm approx. 21 units road gullies approx. 214 units storage element boxes from PE to be installed as rainwater retention, incl. all ancillary works as complete services, installation in 4 sub-areas Landscaping works approx. 260 m³ topsoil supply and installation approx. 830 m² grass seed supply and application, incl. completion and development care approx. 20 m² finished turf, W.: 40 cm supply and lay Tree care Crown care of 18 trees Equipment 1 unit enclosure for recyclables special design Execution: steel profiles as frame on concrete foundations with wall elements field filling by means of wooden slats, 1 single-leaf swing door 1 unit enclosure for refrigeration technology special design Execution: steel profiles as frame on concrete foundations with wall elements field filling by means of wooden slats, 2-leaf swing door

CPV codes

Construction workParking lot construction workLandscaping workDrainage works

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders