Skip to content
Back to search

Germany – Ancillary works for pipelines and cables – Tiefbauarbeiten zum BV "Sanierung Lietzenburger Straße"

BEW Berliner Energie und Wärme GmbHGermanyPublished on Oct 04, 2026
No deadline given

Description

The BEW Berliner Energie und Wärme GmbH intends to award civil engineering and pipeline construction services for the rehabilitation and capacity expansion of a district heating line in Lietzenburger Straße in Berlin. The section of the line to be rehabilitated covers a length of approx. 950 m between Sächsische Straße and Rankestraße, including the associated house connections and distribution lines. In the section between Knesebeckstraße and Fasanenstraße, the works will be carried out jointly with the NBB Netzgesellschaft Berlin-Brandenburg. This requires the rehabilitation and partial relocation of an existing gas pipeline DN 800 to create the necessary construction space for the reinforcement of the district heating line. The subject of this tender are the civil engineering services of BEW Berliner Energie und Wärme GmbH (Contracting Authority 1 / Section 1) and the NBB Netzgesellschaft Berlin-Brandenburg (Contracting Authority 2 / Section 2). The scope of services includes in particular: • Civil engineering works including the creation, maintenance and dismantling of excavation pits and shoring systems as well as the restoration of surface pavings, • Dismantling of existing heating ducts, pipelines and shaft structures as well as • New construction and reconstruction of shaft structures including structure entries. The construction measure will be divided into seven construction sections and will comprise a total of the dismantling of approx. 800 m of existing district heating line and the new laying of approx. 1,000 m of district heating lines of different dimensions. In addition, several shaft structures will be rehabilitated, newly erected or dismantled and numerous system transitions and network connections will be created. Special requirements exist in the maintenance of the heat supply during the entire construction period through operationally ready above-ground line provisories. At the same time, traffic management and accessibility for residents, businesses, pedestrians and cyclists must be ensured. Due to numerous parallel infrastructure projects in the project environment, close coordination with authorities, supply companies and project participants is required. To minimise the impacts, it is planned to carry out several construction sections simultaneously.

CPV codes

Ancillary works for pipelines and cablesDistrict heatingWorks for complete or part construction and civil engineering workGeneral construction work for pipelines

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders